My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2018 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
11/15/2018 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 5:01:34 PM
Creation date
12/7/2018 9:14:00 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/15/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9 <br /> Community Preservation Committee <br /> Minutes <br /> November 15, 2018 <br /> Applicant: Mash ce Conservation Commission and Falmouth Rod & Gun Club <br /> Proposal Title: Garner Bogs/Upper Childs River Restoration Project: $240_,5.10 (cont'd) <br /> It was disclosed the Falmouth Rod& Gun Club and the Town of Mashpee recently completed <br /> negotiations and executed a 20-year lease agreement on the 24.7 acre parcel containing the <br /> Garner Bogs,the northern tip of the Farley Bod and the Childs River which flows between the <br /> two bogs. The title remains with the Town of Mashpee and the Conservation Committee is <br /> responsible for the administration of this land. <br /> Mr. Anderson indicated the full scope of this project encompasses 40 acres of land and water in <br /> the Towns of Mashpee and Falmouth. The goal of this project is to reconstruct the Childs River <br /> channel through the Garner Bogs, remove flow control devices which are barriers to fish passage <br /> and restore the abandoned Garner cranberry bogs to wetland creating permanent habitat for <br /> waterfowl and wildlife. <br /> It was explained there is a lot of sand deposition, layers within the bog,plumes, bog <br /> infrastructure and impact on the continuity of the river and fish as well as wildlife. <br /> The first two phases of engineering are complete. The project is anticipated to get to 60% design <br /> plan by the end of November. The 60% design plan will allow the permitting phase to begin. <br /> Phase 3 of the design plan is expected to be completed in the late Spring of 2019 with the <br /> completion of construction in late Spring 2020. The Town of Falmouth Community Preservation <br /> Committee was noted to have contributed $150,000 in CPA funding for the Falmouth portion of <br /> the project. Additional grant funding has been obtained. The total outside funding awards to <br /> date amount of$668,810. The cost of the proposed project is $1,829,638. <br /> It was noted that a ground penetrating radar study was conducted in October of 2017. The data <br /> describes the depth of the bottom of the peat layer within the bogs, and mapping to divert the <br /> river and areas notable to support heavy equipment for this project. <br /> In closing it was reaffirmed the creation of a cold-water fishery will foster the return of a <br /> reproducing population of Sea Brook Trout, American Eel and other native fish. In addition to <br /> restoring the abandoned cranberry bogs to wetlands for waterfowl and wildlife habitat, the <br /> restored wetland will act as a natural water filtration system for the local watershed in a 50 year <br /> flood event. The project will also provide recreational activities, education and pollinator fields. <br />
The URL can be used to link to this page
Your browser does not support the video tag.