Laserfiche WebLink
distribution to other key parties,along with two digital copies of any text and tables in Microsoft Word and Adobe <br /> PDF format,and any plans in AutoCAD release 2005 format or,if appropriate,as ArcView compatible files. <br /> This report shall document the findings of subsurface investigations(if needed)described in task VII L. <br /> K. After sufficient time for review and publicity, the report shall be presented by the ENGINEER at a public <br /> meeting sponsored by the COMMISSION. <br /> L. If authorized to proceed with this work item by the COMMISSION, the ENGINEER shall perform <br /> subsurface investigations on the selected effluent discharge site or sites. The subsurface investigation shall include <br /> the following: <br /> • Installation of monitoring wells on the selected site. <br /> • Characterization of the soils from the monitoring wells. <br /> • Pump testing of the wells to determine hydraulic conductivity of the site. <br /> • Computer modeling to evaluate potential groundwater mounding and nutrient transport resulting from the <br /> effluent discharges being considered. <br /> Phase VIII Environmental Review Documents. <br /> A. ENGINEER shall prepare a Notice of Project Change (NPC) as a follow-up to the previously-submitted <br /> ENF/DRI document. <br /> B. ENGINEER shall prepare an Alternative Screening Analysis Report as described below: <br /> • Combine appropriate portions of Phase III,IV, and VII C and G. <br /> • Prepare the report in accordance with DEP wastewater planning guidance documents. <br /> • Attend a regulatory review meeting with DEP, CCC, CMAST CZM and DMF to review findings of the <br /> report. <br /> • Attend a MEPA and/or CCC public hearing for this phase. <br /> • Print and distribute up to 45 copies of the report. <br /> C. ENGINEER shall prepare a Recommended Plan/Draft Environmental Impact Report(DEIR) as described <br /> below: <br /> • Utilize the approved Recommended Plan as accepted by COMMISSION in Phase VI along with <br /> necessary environmental impact information to produce the DEIR. <br /> • Attend a regulatory review meeting with DEP, CCC, CMAST CZM and DMF to review findings of the <br /> report. <br /> • Attend a MEPA and/or CCC public hearing for this phase. <br /> • Print and distribute up to 45 copies of the report. <br /> D. ENGINEER shall prepare a Recommended Plan/Final Environmental Impact Report(FEIR) as described <br /> below: <br /> • Utilize the DEIR and respond to regulatory comments. <br /> • Attend a regulatory review meeting with DEP, CCC, CMAST CZM and DMF to review findings of the <br /> report. <br /> • Attend a MEPA and/or CCC public hearing for this phase. <br /> • Print and distribute up to 45 copies of the report. <br /> Phase IX Public Participation Outreach. <br /> A. ENGINEER shall perform the following Public Participation Outreach: <br /> • Present project updates at two public meetings during the duration of the project. <br /> • Present each phase of the project at COMMISSION Meetings as described in earlier phases of the project <br /> scope. <br /> 9 <br />