Laserfiche WebLink
L <br /> 552 Mashpee Neck Road continued <br /> Torn Fudala said he is confused'because the first floor and basement exactly the sane Plan. <br /> Barbara Milton said it is the same layout except downstairs has Y bath. Storage downstairs is the <br /> utility room with washer and dryer. Garage is separate and attached. Bob Nelson commented that <br /> the garage is completely blocked off. <br /> Charlie said we need layout of upstairs. Bob Nelson advised that he was told that as of yesterday <br /> unpaid takes are still due on this property; applicant said only about $3,000. <br /> Barbara Milton said the contractor did the Plans; both floors are the sane but upstairs is all living <br /> room. There are 3 bedrooms upstairs; 2 bedrooms downstairs. Charlie said we need actual layout of <br /> what the first floor is. Charlie also said they will need to do a walk through. <br /> Glen Harrington said the septic is built for 5 bedrooms. Glen said a septic inspection needs to be <br /> done...the system was installed 2001. <br /> Door going upstairs is locked. Barbara Milton said they intend to rent downstairs; upstair.§will be for <br /> family. <br /> Tom Fudala stated that under zoning an accessory apartment can't be more than % of the house <br /> space. <br /> Torn Fudala said the building Plan doesn't match the site Plan. Also, Torn said the parcel is listed <br /> wrong in the application; it doesn't match the Assessor's record. <br /> Motion: Glen Darrington motioned to continue until Building DepartmentfFire l eparrt ent <br /> alk through is done; septic inspection is done; takes are addressed; and the area for the <br /> accessory arpartrnent is determined. Joel Clifford seconded the motion; and it was <br /> unanimously passed. _ <br /> 64 Industrial [give <br /> Proposed 111 arehou a/Light Industrial/Accessory Office <br /> Robert Spenlinhauer, Tte. classic Auto fealty Trust <br /> Devised Plans from last meeting April 5, 2011 <br /> Dan geed on (Attorney), and Scott ,Jones (Project Engineer) appeared. Attorney Creed'on addressed <br /> the meeting saying that they met with Matt Eddy for hire to put together revised $Re plans based on <br /> issues raised by this group, as well as Planning Board and Mr. Rowley.Arley. He noted changes: <br /> 0 gees removed from over the leeching area and replaced with shrub covering. <br /> 0 Relocated north curb cut to move it further north up Industrial Drive. <br /> o Sprinkler has been moved to'the north side to coincide with fire lane. <br /> 0 Concrete sidewalk has been removed on the north side. <br /> Full grading/drainage <br /> o Removed a durpster. <br /> Have storm water management Plan. <br /> 2 <br />