My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/19/2011 DESIGN REVIEW COMMITTEE Minutes
>
7/19/2011 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2019 11:43:45 AM
Creation date
1/3/2019 11:43:25 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee 130 Shoppes Inc <br /> Bill Hulbig <br /> Modify Planning Board Special Permit <br /> Retail and Medical Use <br /> Tom Fudala stated that this application is a minimal change that original Special Permit is for retail <br /> use and they want to change to medical use. Peter Scanlon, Executive Director, addressed the <br /> meeting and said copies of floor plans were submitted. Sign already approved...they are just <br /> changing names on the sign. He said it is strictly an interior change. <br /> • Building is 6,900 square feet. <br /> • 2 small buildings out back are not part of this meeting. <br /> • Commercial zone allowed use. <br /> • Joel Clifford stated they should review Chapter 34 to see if fire alarms and sprinklers are <br /> required in the building under Section 8 Edition of the Building Code. <br /> • Applicant said there is existing fire alarm system in the building which will be modified for this <br /> use. <br /> • 6-7 doctors planned for the building. Glen Harrington stated the septic flow is based on <br /> number of doctors in the building. Applicant said these are not medical doctors—this is <br /> counseling so it's more of office use than medical office. Glen said then it would be just <br /> straight office use. Tom Fudala noted this sort of falls under the clinic use under the zoning <br /> by=laws. <br /> • Glen Harrington advised Board of Health needs something from the engineers to say that the <br /> change of use will fit into the existing capacity flow of the septic. Glen suggested Peter <br /> Sullivan of Sullivan Engineering should draw something up to say it's an office use and show <br /> it's within the capacity per 1,000 square feet—use 75 gallons/day. <br /> • Glen asked whether there was any use in the building since septic was installed. Response, <br /> "no" <br /> • Catherine Laurent advised that the last time she was at the site there was still landscaping <br /> work that-was outstanding along Ashumet Road. Catherine said earthen berm issues along <br /> Route 130 is filtering into Town drainage along 130. Applicant said they will check out but they <br /> believe problem was off a different property. Catherine said she may speak with them about <br /> doing something temporary because it is washing into Town drainage. <br /> Motion: Scott Carline motioned Plan Review to approve pending confirmation of Chapter 34 <br /> review regarding fire alarms and sprinklers and a letter to the Board of Health regarding office <br /> septic capacity; Glen Harrington seconded this motion; and it was unanimously passed by <br /> Plan Review. <br /> Motion: David Kooharian motioned Design Review approves as recommended by Plan <br /> Review; Bob Nelson seconded the motion; and the motion was unanimously passed by <br /> Design Review. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.