Laserfiche WebLink
ti <br /> No comment from the public <br /> Motion: Mr. McKay moved a Negative Determination, seconded by Mr., smith. <br /> Vote unanimous -o <br /> 6:09 John J. Donovan, Jr. and Barbara A. Donovan, 31 James circle. Proposed <br /> removal and replacement of retaining wall within same footprint, <br /> Resource Area: Inland Funk leading to John's pond <br /> Stephen Hanlon,-Hanlon Landscapes, represented the applicants. He explained the <br /> proposed project consists of removing existing wall and install new wall using stohe and <br /> reconstruct the steps. He said he will be removing the shrubs and will replant therm in <br /> the sane area. <br /> The Agent recommended a Negative Determination <br /> No Comment from the Public <br /> Lotion; Mr. McKay moved a.Negative Determination, seconded by Mr. shaver. <br /> Vote unanimous „0 <br /> 6:12 George W. and Donna M. Jordan, 132 Whippoorwill Circle. Proposed <br /> additions to an existing dwelling. RDA <br /> Resource Area: Flood Zone, salt Marsh, Great River <br /> Bob Green represented the applicant. He explained the proposed project is build a <br /> garage and an addition to the kitchen. The Agent reviewed the resource areas and <br /> referred to the photos and the area where the proposed garage.is to be constructed. He <br /> noted the trees and recommended the condition of a site visit to see what sort of <br /> removal of the trees is necessary. He suggested if they are cutting or pruning they seal <br /> any cuts so as not to release any pitch pine which attracts the turpentine beetles. The <br /> Agent noted the Board of Health has received the application and a septic inspection is <br /> required. <br /> No comment from the public <br /> Motion: Mr. Moray moved for a negative determination with the condition the <br /> Agent conducts an onsite visit, seconded by Mr. shave. vote unanimous -o <br /> 6:15 Robert M. and Marjorie A. Hackett,Trustees, 8 Stanley Road. Proposed <br /> removal of four trees to allow for installation of septic system upgrade <br /> RDA <br /> Resource Area: LSCSF <br /> Michael Pimentel� Project Engineer, represented the applicants. He described the <br /> proposed project is to replace an existing cesspool with a new Title 5 septic system for <br /> an existing single family home located on a 101000 sq, ft. lot within Land subject to <br />