Laserfiche WebLink
s <br /> Page 4 <br /> s Board of Selectmen <br /> Minutes <br /> August 19, 1997 E <br /> 5-10 SD-5AV Plume and Investigation: <br /> f, <br /> The purpose and scope of the investigation is to determine if the <br /> plumes extend beneath and beyond the ponds indicated Mr.Fisher. {. <br /> He suggested that a sentinel well system downgradient of John's <br /> Pond be established. <br /> It was noted that Jacob's Engig'neerin is scheduled to release a <br /> rt on November 25 1997. <br /> draft report ! <br /> Jim Quinn, a representative from Foothills Engineering indicated <br /> that he concurs with Mr. Fisher's findings and comments. <br /> z. <br /> Mr.Fisher presented a detailed analysis of his investigation and . <br /> IT <br /> assessment to members of the Board of Selectmen. <br /> Adjournment: <br /> Meeting adjourned: 9:05 p.m. <br /> Respectfully submitted, <br /> Kathleen M. Soares { <br /> Board Secretary <br /> i <br /> I 11J, <br /> i <br /> 4 <br /> i� <br />