My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/1/1996 BOARD OF SELECTMEN Minutes
>
7/1/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:12:30 PM
Creation date
1/31/2019 3:41:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
07/01/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br /> Jude 27, 1996 <br /> Page 3 <br /> IROD has been changed to reflect such a chane in the goals and objectives <br /> . . g g o �ect�ves nor that <br /> the communities have consented to such an approach. <br /> 11. Zone II of contribution of thero osed water supply ' <br /> P P pp y well starts at John's Pond. Data <br /> must be developed to identify if any contamination has entered this zone. This is <br /> critical to Mashpee as considerable money is planned to be spent i <br /> n the very near <br /> future on the development of a wellhead to address the expanded needs of the Town. <br /> 12. Because Mash residents in the Tri-Town <br /> P� area of the Town are connected to the <br /> i <br /> Falmouth water distribution system,which s to only receive wellhead treatment, we <br /> believe the residents in this area of our community should be connected to the <br /> Mashpee Water Distract so that they receive the cleanest waterP ossible, <br /> Consequently, we expect the extra expense of interconnection to be funded and <br /> included as part of the plan. <br /> 13. We would suggest that by having interconnection between the comm es,es, the <br /> Town of Mashpee will act as a backup for water source either on an as needed"basis <br /> or on a more permanent basis if the situation warrants an upper Cape re 'onal water <br /> operation. <br /> � <br /> Two members of our community, who represent the Town on the Process Action Teams <br /> Juan Bacigalupi and Greg Taylor, have already submitted relevant and comprehensive comments <br /> on the Plan. The Town � <br /> fully supports and adopts these comments and requests that the be <br /> me rated b reference into these co y <br /> � y comments submitted by the Town. <br /> The Town takes the Revised Strategic Plan very seriousl . W ` <br /> . ry y e are very concerned that the <br /> Plan appears to represent a retreat from prior coma fitments to develop a timelyand effective <br /> invests s <br /> anon an <br /> g d remediation plan. We are especially troubled that the Plan does not appear to <br /> PP <br /> mandate effective measures to stop further advancement of the contaminated lames into <br /> Mash ee's oundw P � <br /> p gr . .aters, As,a result, the Town is considering all possible means of relief <br /> including exploring its legal options. <br /> Please incorporate this letter into the Administrative Record for the Draft S trate 'c Plan. <br /> an. <br /> MASHPEE BOARD OF SELECTMEN <br /> Peter A.D*InI71*o,Chairman George R. Costa <br /> to <br /> s <br /> Curtis W. Frye Nancy JCaff <br /> � y . yn <br /> Kenneth E. Marsters <br /> /bIa <br />
The URL can be used to link to this page
Your browser does not support the video tag.