Laserfiche WebLink
effluent. They will be putting a liner around the wall and establish a work limit line. There <br /> will be no increase in bedrooms. He said they are doing the best they can with what they <br /> have to work with and the project will be an improvement to the site. <br /> The Agent stated the proposal has been submitted to the Board of Health and the project <br /> is on their agenda tonight for variance relief. He noted the project is not located in a Zone <br /> 2 and water recharge area. <br /> The Agent showed some photos of the site. He noted the area where the leach field is <br /> proposed and where the retaining wall will be replaced and stated it is a sturdy concrete <br /> wall and should be no disturbance to the dirt road. He noted the driveway and inquired <br /> about the berm and suggested some cutouts for drainage. He also stated this is an NOI <br /> because the proximity of the leach field to ensure if anything happened during <br /> construction, we could make it enforceable. <br /> No comment from the public <br /> Motion: Mr. Sweet moved to Close and Issue with the condition of the approval of <br /> the Board of Health, seconded by Mr. Dalton. Vote 5-0 unanimous <br /> 6:12 Thomas Smith (Applicant), 1437 Great Hay Road. Proposed aquaculture <br /> project in Great River. Continued from 3122/2018 to allow applicant time to obtain <br /> local and state approval. NOI <br /> The Agent stated previously there was a discussion among the Commissioners regarding <br /> how many continuances are allowed. The Commissioners had a discussion regarding the <br /> demonstration of compelling need to continue Mr. Smith's hearing. The Agent noted he <br /> did advise Mr. Smith to attend the meeting to give an explanation. Mr. Smith was not <br /> present and Dan Ojala, Down Cape Engineering, represented Mr. Smith. <br /> No comment from the public <br /> Motion: Mr. Sweet moved to continue the hearing until March 28 at time slot to be <br /> determined with the caveat that it will be the last one if his project isn't ready for <br /> review by March 28, 2019, seconded by Mr. Dalton. Vote 3-2 Mr. Dalton, yes, Mr. <br /> O'Neill, yes, Mr. Sweet, yes Mr. McKay no, Mr. Smith, no. <br /> 6:03 Michael D. & Angela Madnick, 27 Uncatena Road. Proposed construction of <br /> dock, ramp and float. NOI <br /> The Agent stated this hearing has been requested to be continued at the request of the <br /> applicant to February 14 at 6:00 p.m. The reason is the plan that was drafted for this <br /> project showed the incorrect footprint of the dock so they have to revise the plan. <br /> Motion: Mr. Sweet moved to continue this application to February 14 at 6:00 p.m., <br /> seconded by Mr. Dalton. Vote unanimous 5-0 <br /> Chad left the meeting to attend the CPA meeting <br />