Laserfiche WebLink
head has to be replaced which is - still under warranty. The <br /> manufacturer has lost quality - control . Dock permits will follow <br /> the Ch, 91 licensing process. Mr. Ellis is ]peeping the patrols <br /> up, and he will cheep moorings .soon. . <br /> SHELLFISH' CONSTABLE REPORT: Mr, York referred to an article <br /> about stinging jellyfish. Nothing new to report otherwise. <br /> . COUNTY DREDGE STATUS: Ir. Gordon had nothing to report. <br /> SUB COMMITTEE REPORTS <br /> A. Inland Waterways: Mr. Ho teyer reported a lost/stolen ]goat <br /> on Santuit Pond. <br /> B. Popneset Bay: Dr. Gordon had nothing to report.. <br /> wa uoit Bay: Mr. Fordham reported heavy water traffic with <br /> the heat, He noted that the water- looked dirty off Washburn. <br /> D. BY-Laws Re-Work: Mr. Silver reported that he, Mr. Hanks <br /> Mr. Homeyer,, and Mr'. Ellis have been working on this pro3ectV <br /> draft dated 8/6/95 of the changes was distributed. A copy <br /> has been faxed to the legal department and hopefully in time <br /> for a public hearing before Town- Meeting in October. Mr, Silver <br /> asked members to look through the draft and compare it with <br /> the oldBy-Laws and call hien withany changes by Friday. <br /> OTHER OLD BUSINESS <br /> A. Conservation Commission Letter: Dr. Gordon stated there <br /> has been no response to his letter re: the disturbance to the <br /> ., Eco-System. It was suggested and decided to address the same <br /> letter to the Conservation Chair and vice Chair with a cover <br /> .letter and hand' delier. <br /> B. Conservation Commission Handout for Boaters: No report; <br /> it was decided to let this pass . <br /> .- Dredging Project Status Pop onesset) : Nothing' to report. <br /> D. Dredging. Proj e t Status Ta uoit : It was suggested to <br /> draft a letter to Bob whritenouir from CRMO or Waterways asking <br /> that he go out to bid for the permitting process . Dr. Gordon <br /> will continue going. to the meetings pertaining to this. Dr. <br /> Cordon asked if w are going to extend the 1987 permits . <br /> Mr. Hanks stated that we can do maintenance dredging or <br /> improvement dredging, and he recommends going for .the improvement <br /> - dredging as a first attempt, Dr, Go.rdon asked if the scope- <br /> of <br /> o - <br /> of the permit is all encompassing since he feels we need a new <br /> barrier beach and a solution to the estuary problems. Mr. Hans <br /> suggested forming a dredging sub committee to work out details. <br /> - - <br />