Laserfiche WebLink
i <br /> f f <br /> Page 2 <br /> Town Hall Building Conn ittee <br /> Minutes <br /> March 26, 1997 <br /> REPORT OF THE ARCHITECT: <br /> Mr.Taylor proposed that a Cape Cod berm be constructed to separate the <br /> grade of the proposed rear landscape from the asphalt area. Mr. Tit was <br /> requested to seely credit from the general contractor with regards to the <br /> installation of the berm in place of asphalt, and also to obtain credit for the <br /> rear pipe mils designed to enclose the exterior planters. <br /> It was noted that the future landscape planting of approximately 30' <br /> wiR give adequate separation between the parked vehicles to allevi <br />