My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/19/1995 TOWN HALL BUILDING COMMITTEE Minutes
>
7/19/1995 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:05:34 PM
Creation date
4/24/2019 2:42:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/19/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MA HPBE TOWN HALL BUILDING COMMITTEE <br /> Minutes for July 19, 1995 <br /> Page <br /> • They did have a concern regarding the HVAC system that the -engineering <br /> subcontractor had installed and that they were not satisfied with it; <br /> • The system the Town Manager had reported was the sane one that Donharn <br /> and Sweeney had proposed for the current project; <br /> • The Town Manager had stated that D nh rn & Sweeney's services had been <br /> terminated at the punch list stage as their building committee had run out of <br /> money; <br /> • There had been a personal conflict with the project ;manager and the chairman of <br /> the committee; <br /> • When asked if they would consider Donham. and Sweeney for a project in the <br /> future, they had stated they would. <br /> Bob Fox reported that he had called regarding the south Hadley Police Station project <br /> that Donham and Sweeney had completed. Bob reported that he had been told <br /> through a subcontractor that there had been a problem with communications. Bob <br /> called the Chief of Police and reported the following: . <br /> • They had a problem with the engineering subcontractor; <br /> • They had a major problem with the location of the system, <br /> • This had been a two story, brick building of new construction; <br /> • Donham and sweeney had done good layout work and that the project had come <br /> in under the quotes when it had gone out to bid; <br /> • The Police Chief had recommended to try and get local subcontractors as they <br /> had discovered that commuting had become an issue during construction; <br /> • Overall Donham and Sweeney were good, but they were still not pleased with <br /> the engineering firm that they had used; <br /> 40 They would consider using Donharn and Sweeney again in the future. <br /> Bob Whritenour reported that he had spoken with the Town Administrator in Harwich <br /> regarding the $3,000,000 Fire station project that Donham and sweeney had worked <br /> on. Bob stated that he was told the following: <br /> 0 They had conducted reference checks on Donham and sweeney prior to the <br /> awarding of their contract and that Donham and Sweeney had received very <br /> high recommendations; <br /> a Brett Donham had been heavily involved in their project and they would rant <br /> thea as one of the best; <br /> There had been a couple of problems with the design, i.e.} the garage doors <br /> the original ones designed had been too small; and with the exhaust system <br /> .the subcontractors apparently had had a problem with the sole source identified <br /> in the specifications, <br /> • <br /> Regarding construction management, they had done a very thorough job. <br />
The URL can be used to link to this page
Your browser does not support the video tag.