Laserfiche WebLink
MASH EE TOWN HALL BUIWING COMMITTEE <br /> Minutes for August 16, 1995 <br /> Page <br /> belong Kamp if the acquisition of the temporary trailers would be part of the <br /> construction bidding package. Ms. belong Kamp stated that the trailers would be <br /> separate. ,Jim suggested that the trailers could probably be obtained one month prior <br /> to the commencement of construction and that this would provide for a smoother <br /> transition. <br /> Jinn asked Bill Hauck if they would be required to install toilet facilities in the trailers. <br /> Bill stated that he would check on this but felt that at least some kind of canopy to the <br /> existing facilities would need to be provided. Bill stated he would check with the <br /> plumbing inspector on this issue. <br /> Jim asked Ms. C elong hamp if she saw a problem with construction bid advertising <br /> during the holidays. She stated that it was only slightly more difficult. <br /> Tori Wren asked Ms. belong hamp what kind of construction supervision did she think <br /> would be required. She stated that weekly on site meetings would be required, at least <br /> initially. Jim stated that Roger Hoit had stated that this project would require a 25 hour <br /> per week Clerk of the Works. He stated that this person would come on board as the <br /> construction commenced. <br /> Tori Wren stated that after the completion of the Mashpee High School project, the <br /> architect will have a large quantity of files that will need to be given to the Town. Jinn <br /> stated that this is not a responsibility of the Town Hall and referred Mr-. Wren to speak <br /> with Dr. Delloura regarding this issue. <br /> Ms. belong Kamp asked if the Committee would like to meet with Strekalovsky & Hoit <br /> prig to the meeting with the department heads. Jim Stated that he did not feel this was <br /> necessary. Jiro asked if there was anything that Ms. [ elongcharp felt that the <br /> Committee should be doing in the interim. Ms. Delongchamp stated that she would <br /> need a copy of the Tern Hall Building Committee meeting minutes and a list of whom <br /> R Strekal ovsky & Hoit would be meeting with for each of the departments. _ <br /> Flay eked when the engineer on this project would be corning. Mils. Delongchamp <br /> stated that he would reed to ging the drawings and should be coming down within the <br /> net couple of weeks. Jim informed Ms. belong hamp that Rey would be the contact <br /> person on any of the systems issues. <br /> A brief discussion was herd on how best to coordinate and schedule the movement of <br /> the existing offices during construction. <br /> Ms. belong Kamp stated that hopefully she will be meeting with the department heads <br /> net week. Jiro stated that the net Committee meeting is scheduled for August 30# <br /> 1995, at 2:00 p.m., in the Selectmen's Meeting Room. � <br /> t -- <br />