Laserfiche WebLink
Minutes of Meeting of <br /> Mashpee Plan Review Committee <br /> Held Tuesday, Tuesday, June 4, 2019 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Glen Harrington, Board of Health <br /> • The bathrooms for each unit only need to be plumbed, and does not need to be <br /> built until tenants are ready (slab construction). <br /> • The commercial condominium needs to be inspected every three-years. <br /> • He asked if there's an industrial waste water holding tank. <br /> • There will be a floor drain in each unit. . <br /> • Glen suggested that a denite system could be installed at the time of construction <br /> if there's a use change to accommodate going over 600 gallons a day. It allows <br /> more flexibility for the uses in the units. <br /> • The location of the septic is showing under the pavement to the rear, if that is <br /> moved outside of the pavement to put in a FAST tank or upgrade to a denite, it will <br /> be less work to tear up the pavement. It will also require a Title 5 Variance for any <br /> components under pavement. If the tank is moved outside the pavement, it will not <br /> require a Variance. <br /> • All commercial, properties require Board approval. There will be a list of <br /> requirements that the Board will review at the meeting. <br /> • Dumpster and Recycle bins. <br /> Tom Rullo, Fire Chief <br /> • The building needs to be sprinkled. <br /> • Utility room located in the bump out on one end, and the FDC at the other end <br /> which is better because that's the initial access. The panel will be located in the <br /> bump out. <br /> • Fire Protection Engineering Plans. <br /> • Controlled Construction Documents. <br /> • Hydrant is located on Mercantile. <br /> •. Check the turning radius for the fire trucks. <br /> • Gravel section to have access. <br /> • Smoke detection system. <br /> • Separation requirement if boats are stored. <br /> Charlie Maintanis, Building Inspector <br /> • Dan said that the gravel is a T-base cross section, with a full 12" repressed <br /> processed asphalt gravel,with 4"of mix, and 2 inch of 3/4"washed stone rolled in <br /> with a 10 ton roller. <br /> • Can the condo documentation state that no alteration can be made without the <br /> proper permitting. <br /> • Fire separation might be required depending upon the type of use, and a possible <br /> sprinkler system upgrade. <br /> • Section 174-41 does address the permitting authority can allow for gravel parking <br /> spaces. Dan said he can pave a few more spaces. <br /> • He likes the raised concrete walk way along the side. <br /> 2 <br />