My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2019 PLAN REVIEW COMMITTEE MINUTES Minutes
>
07/16/2019 PLAN REVIEW COMMITTEE MINUTES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2019 5:01:35 PM
Creation date
10/15/2019 12:41:13 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLAN REVIEW COMMITTEE MINUTES
Meeting Document Type
Minutes
Meeting Date
07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of Meeting <br /> Plan Review Committee <br /> Tuesday, July 16, 2019 <br /> 10:00 am Business Name: Industria Development Group, Inc. <br /> Project Address: 413 Nathan Ellis Highway <br /> Agent: Kevin Kirrane, Esquire <br /> Engineer: Atlantic Design Engineers, Inc. <br /> Request: Applicant is proposing to construct a 9,993 sq. ft, <br /> commercial building for retail use with accessory parking. <br /> Attorney Kevin Kirrane represented the project. Also present was Chris <br /> King, with Atlantic Design. This lot was developed back in the 1980's when <br /> a lot of the regulations were not in place. This site is commercially zoned, <br /> and the proposed use is a Dollar Tree which is a one tenant retail use. The <br /> proposed building will be 9,975 sq. ft., and the lot size is 51,000 sq. ft. The <br /> lot percentage conforms to the Zoning Bylaws, but because' of the <br /> regulations that have been .adopted since this lot was created many years <br /> ago, there are certain variance requirements that will be requested by the <br /> ZBA which includes the location of the parking, dealing with the subsurface <br /> drainage issue, and the surface drainage issues, location of the landscaping <br /> within a parking area, and certain setback criteria. Attorney Kirrane <br /> mentioned that there is a road that is completely located within the lot. Over <br /> the years that road was not part of the lot, but over the years the land court <br /> plans changed. The plan depicted a dotted line showing the location of the <br /> road was and was abandoned. Attorney Kirrane did apply for a variance <br /> from the setback requirements from that road, even though it does not exist, <br /> to cover all the necessary bases. It would need to comply with a 75 ft, <br /> setback from Ninigret, a 75 ft. setback from Nathan Ellis, and a 50 ft. setback <br /> from the adjacent residential area. He said it isn't really practical to have <br /> parking on the rear and side in this case unless there is relief from the <br /> building location. If the building location were moved forward, so there <br /> wouldn't be a variance from the 75 ft. front yard setback'for the building, <br /> than it might be possible to locate the parking to the rear of the building as <br /> opposed to the front. But the adjacent businesses such as Andy's Market, <br /> Dino's, and the strip mall with the landscape business across the way, all <br /> those uses have parking in the front of the buildings. So what is being <br /> proposed is not inconsistent on a design prospective, and unless the <br /> building itself is sitting on the street it is virtually impossible to accommodate <br /> parking behind the building. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.