MASHPEE ZONING BOARD OF APPEALS
<br /> MEETING MINUTES
<br /> AUGUST 26,2020
<br /> Mr. Blaisdell said as part of the motion, the temporary tent will not be erected until after
<br /> the construction of the temporary additions, and the occupancy permit has been issued for
<br /> the temporary additions.
<br /> Mr. Kirrane said that the shed is not part of this application, however he had a discussion
<br /> with Charlie regarding a temporary tent to be utilized during the pandemic situation to
<br /> provide curb-side pickup and protection for the employees who are distributing the product
<br /> during inclement weather.
<br /> There were no more comments from the Board or applicants.
<br /> Mr. Bonvie made a motion that the Board issue a modification to Triple M Management
<br /> Co., LLC of 29 and 41 Echo Road to the existing Special Permits (SP-2015-33 and SP-
<br /> 2019-36) under §174-24 (J) (K) (C) and §174-24 (C) (9) (a) to allow for construction of
<br /> two temporary wing structures(12 ft.x 32 ft.)to be used during construction,and removed
<br /> upon completion of construction of permanent addition authorized by Special Permit
<br /> Decision SP-2019-36, on property located in an I-1 Zoning District, Map 19 Parcels 3-8
<br /> and 3-9, Mashpee, MA. Owner(s) of Record: Triple M Management Co., LLC (#29) and
<br /> Ronald Gangemi (#41).
<br /> 1. The Board has determined that the applicant meets all the conditions of a
<br /> Modification to a Special Permit under Mass General Law 40A Section 9.
<br /> 2. Site Plan: Prepared for: Triple M Management Co, LLC, 29 & 41 Echo Rd.,
<br /> Mashpee, MA. Prepared by: Cape & Islands Engineering, Assessors Information:
<br /> Map 19-3-8 & Map 19-3-9, Drawing Title: Site Plan — Temporary Additions
<br /> Grading & Utilities Plan, Date: June 17, 2020, C-121, Rev.: 1, Date: 6/26/20,
<br /> Description: Revise Septic Inverts, Add Recommended Septic, Installation
<br /> Phasing, Add Holding Tank. Drawn by: RLR, Checked by: RLR. Stamped by:
<br /> Matthew C. Costa,No.: 52282, and Raul Lizardi-Rivera,No.: 46845.
<br /> 3. Building Plans: Permit Set-Dispensary Phase 1, 29 Echo Road, Mashpee, MA.
<br /> Prepared by: 2morrow Studio LLC, Mashpee, MA. Rev. 01: Date: 06/09/20,
<br /> Reference: Pricing, 02: Date: 06/12/20, Slab Edits, 02: 07/08/20, Permit Set. A-
<br /> 001: Cover Page, A-003: Site Plan, A-100A: Existing Foundation Details, A-101:
<br /> Phase One FDN & Floor Plans, A-102: Phase One Lighting & Security Plans, A-
<br /> 103: Phase One Floor Areas &Egress Calcs,A-104: Phase One Roof Plan, A-201:
<br /> Elevations Existing Dispensary, A-202: Phase One Building Elevations, A-301:
<br /> Phase One Building Sections, A-302: Phase One Building Sections, A-303: Phase
<br /> One Building Section, A-304: Existing Wall Sections, A-305: Existing Sections,
<br /> A-401: Common Wall Sections, A-501: Novabrik Details, A-901: Building
<br /> Renderings. Stamped: John B. Connell, No.: 30574, Warren, VT, Registered
<br /> Architect, Commonwealth of MA.
<br /> 4. Conditioned on all Town Department comments read into the record.
<br /> 2
<br />
|