My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/2005 Annual Town Meeting
>
10/17/2005 Annual Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 10:14:19 AM
Creation date
2/23/2021 10:11:03 AM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Plan drawings shall be prepared at a scale of 1 inch — 20 feet on a sheet not to exceed 2 <br /> inches by 36 inches. <br /> §84-5 CONTROL MEASURES <br /> A. Measures to prevent the erosion of soils from the property and the sedimentation of <br /> drainage structures and adjacent wetlands throughout all phases of construction and at <br /> the completion of project shall, at a minimum, include the following. <br /> (1) Stabilization of cleared areas, with.i.n fourteen days of clearing or extended <br /> inactivity in construction (fourteen days or more) by planting of temporary <br /> vegetative cover, mulching, use of erosion control mats or similar measures; <br /> (2,) Stabilization or covering of soil stockpiles at the end of each workday <br /> (3) Prevention of blowing of dust or sediment from the site by mulching, sprinkling <br /> (water), spraying of adhesives or calcium chloride, use of stone, particularly along <br /> construction roads, or providing wind barriers; and <br /> (4) Provisions for the maintenance of the erosion and sedimentation control <br /> measures, including cleaning of drainage structures and affected public/private <br /> ways. <br /> §84-6 INSPECTIONS <br /> A. The Director of Public Works or his designee may enter upon the property of the <br /> applicant for the purpose of conducting regular inspections to ensure compliance with. <br /> the approved Erosion and Sedimentation Control Plan and the provisions of this <br /> Bylaw. These inspections shall be performed at a minimum at the following <br /> intervals. <br /> 1 Prior to the start of construction; <br /> (2) Upon completion of site grading; <br /> (3) At close of construction season or prior to any other long-term stops in <br /> construction (more than 2 weeps) and <br /> (4) Upon completion of final landscaping <br /> B. The applicant shall contact the Department of Public Works (DPW) to schedule these <br /> inspections. tither inspections may be performed at the discretion of the DPW, <br /> including prior to or after a storm. event.. <br /> C. During the inspections, the effectiveness of the control measures in place shall be <br /> evaluated and additional control measures may be required if deemed necessary by <br /> the DPW. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.