My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/05/1973 Annual Town Meeting
>
03/05/1973 Annual Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 5:10:14 PM
Creation date
3/9/2021 1:08:37 PM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wage 12. Annual Town meeting Tuesday March 6, 1973 <br /> Article 34 Continued® ( Mr. Bain speaking) <br /> Their work requires major equipment which is valued in excess of <br /> $113,000®00 which underardinary circumstances should serve them <br /> for about ten. gears® There is also the interest charges on borrowed <br /> money for replacement and repairs to this equ#nent which amounts I` <br /> to several thousands of dollars a year® The lack of housing each <br /> year is sending up the cost of equipment repair and maintenance® <br /> In addition to this when this equipment is needed in the case of <br /> snow storms, etc® , there is a difficulty in getting them started <br /> because they have been out in the cold and the weather. Out-of-doors <br /> is also subject to theft and pilferage . A conservative estimate <br /> would indicate that the lack of a needed place in which to store <br /> and work on and maintain this equipment costs the Town an un- <br /> necessary $10,000.00 a year. With proper working facilities he has <br /> enough men there to do a lot of their own work on these facilities <br /> by way of upkeep and maintenance ® But you cannot expect a man to <br /> do this when there is no place to work. At the days start when <br /> the men should be on the day' s job and be on their way, this lack <br /> of efficiency costs money. The Highway Department must face some <br /> 55, 500.00 on manpower wages® Twenty-five to thirty percent of <br /> this is ineffectual, because you have say only ninety percent efficiency <br /> because of lack of proper machinery and proper housing® If you just <br /> said you had a ten percent lost in this instance it would amount <br /> to about $5,000.00 per year® And the money spent on lossess used by <br /> lack of equipment space and space in which to work can easily <br /> amount to $15,000.00 in wasted money® New facilities are badly <br /> needed, <br /> $93,500.00 is indeed a large sum but you will. ve between <br /> ten to fifteen years to twenty years to pay it® Principal and <br /> interest would amount to about $9,660.00 in the first years, <br /> dropping down to something like $6600.00 in the last years. This <br /> would be offset by your $15,000.00 plus dollars saved® The ex- <br /> penditure of $93, 500.00 will reduce the cost of running the <br /> department® Today' s figures are being used of course® Your Town is <br /> gnawing rapidly, and the highway is the first to feel the impact® <br /> I <br /> i <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.