My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/16/2021 DESIGN REVIEW COMMITTEE Minutes
>
03/16/2021 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 5:00:08 PM
Creation date
5/10/2021 4:01:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of Meeting of <br /> Design Review Committee <br /> Tuesday, March 16, 2021 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Joe made a motion to continue the sign application for 735 Falmouth Road and will <br /> continue with a date to be determined by the applicant and rescheduled with Mary <br /> Ann. Jonathan seconded, yes, Joe, yes, Miles, yes, and Dave, yes. All were in favor <br /> to continue the meeting. <br /> Protect Address: 800 201 B Falmouth Road <br /> Business Name: Foundations Group Recovery Centers <br /> Sign Company: Matthew Anderson with Kiwi Signs Co. <br /> Request: 30 sq. ft. back lit wall sign installed to building. <br /> Matt represented the applicant for a sign that will be halo lit, and has a rear <br /> illumination on the anchor, and the wording. It's fabricated with high density urethane <br /> and aluminum composite material. The smaller letters will be '/4" cast acrylic, and the <br /> bottom tag line is vinyl lettering. The sign is 120" by 36" which is 30 sq. ft. The wall <br /> area is 540 sq. ft. It's 5.5%. He said he can reduce it slightly. There will be 12 volt <br /> LED that face the wall, not the front of the sign. The lettering is opaque and a <br /> transparent back. The letter is spaced off the back background by 2". The light will <br /> illuminate the black with a shadow. <br /> Jonathan said that there's a 5% limit on all walls. It's 10% for the front. He has no <br /> issues. <br /> Miles asked if the white lettering was transparent. <br /> Jonathan made a motion to accept the sign presentation for 800 201 B Falmouth <br /> Road. Joe seconded, yes, Miles, yes, Jon, yes, and Dave yes. <br /> Project Address: 20 Evergreen Circle <br /> Business Name: Evergreen Band LLC <br /> Owner/Agent: Capewide Construction <br /> Architect/Engineer: Dan O'Jala with Down Cape Engineering <br /> Request: 7,320 Sq. ft. Morton Building for use of garage storage and office <br /> space. <br /> Attorney Kevin Kirrane represented the Cape Cod Gutter Monkeys who will be a <br /> tenant in the building that is owned by Evergreen Band LLC. The Board may recall <br /> that in 2018, this project was approved by both Design, Plan Review, and the ZBA <br /> for the construction of two buildings. At the time the applicant was RCA Electrical <br /> Contractors. This project is almost identical to the project that was approved with the <br /> exception that there was only one building proposed as opposed to two buildings. <br /> The larger building is the one that will be built. The smaller building is not part of the <br /> development plan. The parking has been reduced slightly to accommodate the fact <br /> that there is not much square footage, and as a result the need for a number of <br /> parking spaces that were previously approved by the Board are not required. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.