Laserfiche WebLink
existing tree limbs. We need to be extra vigilant with things like erosion control here, might <br /> need someone there as a requirement to monitor the situation above and beyond what we <br /> can do. <br /> Mr. Sweet motioned to close and issue with the condition of an independent monitor <br /> observing the excavation portion of the project. <br /> Mr. Dalton seconded the motion. <br /> Vote: 6-0-0 <br /> Roll Call Vote: <br /> Mr. Smith; yes <br /> Mr. Sweet; yes <br /> Mr. Colombo; yes <br /> Mr. O'Neill; yes <br /> Mr. Dalton; yes <br /> Ms. Zollo; yes <br /> In favor, 6; Opposed, 0; Abstentions, 0 <br /> 6:18 Mashpee Commons, LP, 476 & 483 Falmouth Road and 0 & 299 River Road. Proposed NOI <br /> repair of failed earthen dam at end of Trout Pond. Owners of record: Mashpee Commons <br /> LP and Trustees of Reservations. <br /> Amy Ball and Geoff Glover from Horsley Witten Group, Inc. and Tom Feronti from <br /> Mashpee Commons presented plans. <br /> Agent said he was onsite with Ms. Zollo and Mr. Colombo. He asked about long term <br /> solutions. Amy Ball said the design modifications are intended to be long term, if there <br /> were any other improvements to this area, they would be more aesthetic in nature. Tom <br /> Feronti said the next step is to do an evaluation of the water quality and see how it would fit <br /> in to an overall trail network and walking path system in this part of town. Agent had no <br /> other comments, it's a net environmental benefit. We're still waiting to hear from Natural <br /> Wildlife. <br /> Ms. Cadoret asked if there will be trail access as part of this project? Mr. Feronti said part <br /> of the purpose of this design is that it can be walked over. <br /> Anne Malone from 14 Red Cedar Road asked what the timeline for the project might be. <br /> Tom Feronti said the goal is to get this done as quickly as possible, looking at getting it <br /> done during the dry season, trying for the end of June, beginning of July. <br /> Mr. Sweet motioned to close and issue. <br /> Mr. Dalton seconded the motion. <br /> Vote: 6-0-0 <br /> Roll Call Vote: <br /> Mr. Smith; yes <br /> Mr. Sweet; yes <br /> Mr. Colombo; yes <br /> Mr. O'Neill; yes <br /> Mr. Dalton; yes <br /> Ms. Zollo; yes <br /> In favor, 6; Opposed, 0; Abstentions, 0 <br /> 6:21 Stuart J. & Leslie S. Frank, 22 Little Neck Lane. 3 year Extension of Order of Conditions EXT <br /> 43-2973. Representative: Cape & Islands Engineering. <br /> 6:24 Jeffrey A. & Susan J. Rutchik, 1 Waterline Drive North. Certificate of Compliance Order COC <br /> of Conditions 43-2192. Representative: A.M. Wilson Associates. <br />