My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2021 SEWER COMMISSION Minutes
>
06/17/2021 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 5:01:17 PM
Creation date
8/27/2021 12:38:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AMENDMENT NO. 3 <br /> TOWN OF MASHPEE, MA AND <br /> GHD INC. <br /> PAGE 6 <br /> 6. The Town shall provide a full bid set (by others) for the reconstruction of Route 151. This shall include all work <br /> except the sewer work defined in the GHD scope of work. The work by the Town includes a full bid set of <br /> documents that includes, but is not limited to, bid forms, all MassDOT required documents, etc. A decision on <br /> pump station locations shall be finalized within one(1)month of the agreement being fully executed and planning <br /> phase decisions shall be completed within three(3)months of the agreement being fully executed. <br /> 7. Return all SRF documentation that requires Town signature to GHD within 14 days of receipt but no later than <br /> one week prior to submission date. <br /> 8. Town's Transportation Engineering Consultant shall be responsible for final assembly of all documents, <br /> incorporation of GHD's preliminary sewer layouts, design details, and technical specifications into MassDOT <br /> format, and providing all portions of the design documents, including but not limited to bid proposal and other <br /> boilerplate specifications. <br /> 9. Supplemental soil borings and land survey identified as needed for completion of the sewer design. <br /> 10. Any permitting not included under Task 2.2. <br /> ADDITIONAL SERVICES <br /> Additional services that could be provided upon future written authorization by the Town include the following: <br /> 1. Pump station design (beyond design outlined in the Scope of Services). <br /> 2. Any additional work related to WNMP Phases 1 through 5 except the small part of WNMP Phase 2 defined <br /> above as Phase 2a(beyond what is outlined in the Scopes of Services). <br /> 3. Bidding and/or construction phase services. <br /> 4. Construction permitting (Building permits, NPDES General Permit, etc.). <br /> 5. Any field work except that which is identified in this Agreement. <br /> 6. Design changes resulting from future law, regulation, or code changes(following SRF submission date). <br /> 7. Design changes resulting from industry or manufacturer advances, updates, or changes (following SRF <br /> submission date). <br /> 8. Coordination and/or response to review comments by any other entities outside of the Town employees, <br /> Boards, Commissions, and MassDEP. <br /> 9. Assistance in preparing easement mailings and plans in order for the Town to obtain necessary <br /> easements/rights-of-passage/takings. <br /> 10. Development of utility easement/taking plans for private roads and coordination of recording at the Registry <br /> of Deeds after acceptance by the Mashpee Sewer Commission. <br /> 11. Any permits not specifically outlined in the Scope of Services. <br /> 12. Development of a Notice of Project Change. <br /> 13. Archeological surveys and investigations, if requested. <br /> 14. Police details for any field investigations. <br /> Page 6 <br /> https:liprojects-northamerica.ghd.com/sites/naO4_01/proptownofmashpeepha/ProposaiDocs/11220921-AGR-Mashpes Amend 3 Scope-rev3-working <br /> copy.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.