Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JULY 24,2019 <br /> The queuing lane is all part of the traffic management system to keep cars off the road. If <br /> the queuing lane is not needed, it will be landscaped. <br /> Sharon read the DPW,Board of Health, and Conservation comments into the record. <br /> There were no comments from the Board. <br /> John Miller, a resident who lives on Shellback Way asked if the traffic would increase <br /> beyond the expected amount.Jim Vaccaro said the expected amount will be approximately <br /> 400 vehicles per day which includes the proposed adult facility. There are currently 50 to <br /> 100 patients a day at the medical facility. <br /> There were no other comments from the audience or Board. <br /> Ron Bonvie made a motion to issue a modification to Petitioner,Triple M Management to <br /> an existing Special Permit to(SP-2015-33)under§174-24(J)(C), and(K)if applicable,to <br /> allow for construction of an addition to an existing 1,500 sq.ft.medical marijuana facility, <br /> which will have a footprint of 3,700 sq. ft., and a mezzanine and basement of 1,800 sq. ft. <br /> each to accommodate a recreational use marijuana dispensary in addition to the existing — <br /> medical use dispensary. (Owner of record: 29 Echo Road, Triple M Management), and <br /> (Owner of record:41 Echo Road,Ronald Gangemi,Trustee of 81 Echo Road Realty Trust, <br /> with the following conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a <br /> Modification under Mass General Law 40A Section 9. <br /> 2. Site Plan: 29 &41 Echo Road,Mashpee,MA. Prepared for Triple M Management - <br /> Co,LLC,Date:May 6,2019,Prepared by: Cape&Islands Engineering,Signed by: <br /> Matthew C. Costa No. 52282,and Raul Lizard-Rivera No. 46845,Drawn by:RLR, <br /> Checked by: MC, Rev. 1, Date: 6/6/19, Description: Revise Sheet C-101 & Add <br /> Sheet L-101. G-100: Site Plan Cover Sheet, V-101: Existing Conditions Plan & <br /> Demolition&Erosion Control Plan,L-101,date: June 6,2019:Landscape Plan, C- <br /> 101: Layout Plan, C-121: Grading & Utilities Plan, C-501: Construction Details, <br /> C-502: Construction Details. <br /> 3. Conditioned on all Town Department comments read into the record. <br /> 4. Condition upon any and all host agreements that are in affect as of today's date <br /> will become an integral part of this modified Special Permit. <br /> a <br /> 5 <br />