My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/24/2019 ZONING BOARD OF APPEALS Minutes
>
07/24/2019 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 12:22:17 PM
Creation date
10/29/2021 10:10:51 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
07/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JULY 24,2019 <br /> 9 Shellback Way: Petitioner, Bridgestone Development, Inc. requests Variance relief <br /> under §174-31 FN. 14 (natural state buffer), to allow for construction of a 9,801 sq. ft. <br /> commercial building and accessory parking to be used for professional and medical office <br /> uses on property located in a C-1 Zoning District, (Map 81 Parcel 132), Mashpee, MA. <br /> (Owner of record: Faith J.Baptiste,Trustee of the Cushman Brownie Trust). <br /> Sitting on this hearing are the four regular Board Members and Associate Member, James <br /> Reiffarth. <br /> Attorney Kevin Kirrane represented the Petitioner,Bridgestone Development,Inc. who is <br /> the prospective purchaser and developer of the 9,801 sq. ft. building to be utilized for <br /> medical and professional office space. Also present was Matt Costa, Cape & Island <br /> Engineering, and Michael Facchini, Principal of Bridgestone Development. The site is an <br /> odd shaped parcel of land adjacent to the Rockland Trust Building, and runs behind the <br /> Rockland Trust Building, and flows from Shellback Way Property. The proposed building <br /> is situated in the lower right corner in the front of the property referenced as Rte.28.There <br /> are two access areas onto the property, one area is shared with the Rockland Trust on <br /> Shellback Way, and a proposed entrance as a right turn in, and an exit as a right turn out <br /> onto Rte. 28. This will alleviate any traffic issues on Rte. 28. — <br /> The lot itself has plenty of frontage, and acreage both on Rte. 28 and Shellback Way, and <br /> conforms to the requirements of the C-1 Zoning District. In addition to the proposed <br /> building and parking, there will be proposed service parking needs as well. Initially the <br /> proposal includes office use,and if in the future there is an interest in retail use will require <br /> to return to the Zoning Board for that particular use. However, the proposal includes the <br /> additional parking for the retail use if that occurs. Both retail and offices are allowed uses <br /> upon a grant of a Special Permit by the Zoning Board of Appeals. Also proposed is a <br /> sidewalk that will run from the building to the bike path that is along Rte. 28 to <br /> accommodate any pedestrian traffic for access to the site. As previously indicated the lot <br /> does conform to the zoning requirements for frontage and lot area.The proposed structure <br /> also conforms to all requirements relative to setbacks from Rte. 28;which is 20 ft. from its <br /> northerly boundary, 50 ft. from its rear property line, and adjacent to the residential use <br /> district which is the Deer Crossing Condominium Complex. <br /> As proposed the structure will occupy a near 6% of the lot area, where 25% is permitted <br /> under the zoning bylaw. The Board will take into consideration as it relates to public health <br /> and safety, demand on public facilities, impacts on service and ground water quality, <br /> impacts on estuaries and other waterway systems, impacts on traffic flow and safety, <br /> endangered species, and neighboring properties through accessibilities, vibration, or <br /> electrical disturbances. Attorney Kirrane said this is a low impact office use that is being <br /> proposed and conforms to all zoning criteria and setbacks in this district. There is also a <br /> request for relief from the natural buffer requirement along Rte. 28.There is a requirement <br /> along the areas on Rte. 28 and Rte. 151 to be maintained with a natural buffer. However, <br /> the proposed landscaping will be far more attractive than its natural state. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.