Laserfiche WebLink
• Has duly revised the Plans to provide 59 parking spaces, with 1.5 spaces per dwelling. <br /> • Shall provide appropriate surety to the ZBA to construct the relevant portion of Cooper <br /> Street(f/k/a Cross Street), which may include one or more of the following types of surety <br /> (or combination thereof) at the Petitioner's election: <br /> i. No occupancy permit shall issue until the infrastructure is finished or secured by <br /> money based surety; and/or <br /> ii. Money-based surety may be posted including: (a) (a) a deposit of money; (b) a <br /> surety bond; or(c) a tripartite agreement as provided for under G.L. c.41, §81U, ¶7, <br /> and with the amount of money-based surety to be determined by the Board in <br /> cooperation with the Building Official or the Board's peer review consultant, <br /> and the Board, acting as the Planning Board, shall duly release any existing subdivision <br /> covenant instrument recorded against the Property upon request by the Petitioner. <br /> • Shall provide air conditioning to all units. <br /> • Shall screen mechanical systems, whether on the ground or on a roof, with landscaping or <br /> architectural features as shown on the approved Plans. <br /> 3. The Petitioner shall comply with the Planning Board's Subdivision Regulations regarding <br /> pavement thickness and compliance is shown on the Plans. <br /> 4. The Petitioner shall repair any damages to Cooper Street(f/k/a Cross Street)that occurs during <br /> construction. <br /> 5. The Petitioner revised the Plans to provide for snow storage and a turnaround at the end of <br /> Cooper Street(f/k/a Cross Street) and Petitioner shall be responsible for snow removal to <br /> maintain access to the Project and before any occupancy permit issues for the Project shall <br /> provide the Building Inspector with a snow plowing, snow storage and snow removal plan that <br /> will coordinate snow removal efforts with the abutting landowner for so long as Cooper Street <br /> (f/k/a Cross Street) is a private way. <br /> 6. The Petitioner shall provide recycling infrastructure and comply with DEP's waste ban. <br /> 7. The Petitioner has revised the Plans to extend the sidewalk to SouthCape Resort and to install <br /> two crosswalks to improve safe passing over Cooper Street(f/k/a Cross Street)for the abutting <br /> development as shown on the Plans. <br /> 8. The Petitioner shall limit the hours of outdoor construction activities at the Property during the <br /> months of June,July and August as follows: <br /> Monday through Friday: 7:00 am to 5:30 pm <br /> Saturdays: 7:00 am to 1:00 pm <br /> Sunday: No outdoor construction activities <br /> 5 <br />