My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2021 CONSERVATION COMMISSION Minutes
>
09/23/2021 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2021 5:00:29 PM
Creation date
11/23/2021 3:42:52 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6:06 Hans E. and Sarah J. Brings, 23 Jeep Place. Proposed septic system upgrade. RDA <br /> Raul Lizardi from Cape& Islands Engineering presented plans. <br /> Agent read comments from Board of Health. He said there are no conditions needed, <br /> recommends a negative determination. <br /> Mr.Colombo suggested a condition that grass mix meets requirements, Agent said we <br /> can't condition outside of wetlands jurisdiction. The Commission strongly recommends <br /> lawn standards and Raul Lizardi said he would relay that to the homeowners. <br /> Mr.Sweet motioned for a negative determination. <br /> Mr.Dalton seconded the motion. <br /> Vote: 5-0-0 <br /> Roll Call Vote: <br /> Ms. Zollo; yes <br /> Mr.Colombo; yes <br /> Mr.Sweet; yes <br /> Mr. Dalton; yes <br /> Mr.Smith; yes <br /> In favor,5; Opposed, 0; Abstentions, 0 <br /> 6:09 Town of Mashpee Department of Public Works, 664 Great Neck Road South. NOI <br /> Proposed removal and reconstruction of boat ramp. Continued from 919 for DEP file <br /> number <br /> Raul Lizardi from Cape and Islands Engineering presented plans. <br /> Agent said this is in a state of disrepair and in need of replacement. He recommends close <br /> and issue with conditions from Marine Fisheries if necessary. There are no issues from <br /> Harbormaster or Shellfish Constable. <br /> Mr.Colombo asked if floats are left in over the winter, Catherine Laurent from DPW said <br /> they are left in. <br /> Ms. Zollo asked about the projected timeline, Catherine Laurent said they are going to <br /> Octobertown meeting forfunding, but there are time of year restrictions, so they are <br /> looking to award a contract for construction so work can start before January 15 deadline. <br /> Mr.Sweet motioned to close and issue to include conditions from Marine Fisheries. <br /> Mr.Dalton seconded the motion. <br /> Vote: 5-0-0 <br /> Roll Call Vote: <br /> Ms. Zollo; yes <br /> Mr.Colombo; yes <br /> Mr.Sweet; yes <br /> Mr.Dalton; yes <br /> Mr.Smith; yes <br /> In favor,5; Opposed, 0; Abstentions, 0 <br /> 6:12 Leonardo and Maria Elisa Caruso, 43 Little Neck Lane. Proposed replacement of pier, NOI <br /> ramp and float. Continued from 8126, 919 <br /> Matt Costa from Cape & Islands Engineering presented plans. <br /> Agent said the Commission is encouraged to go by the Shellfish Constable's <br /> recommendation of shellfish mitigation fees. Agent recommendsa close and issue with <br /> conditions of fees from Shellfish Constable, composite grating, and restoration of any <br /> coastal bank areas. No further comments. <br /> Mr.Colombo it's a 12" draft on the 17ft Boston Whaler, that draft is dry wave, no motor. <br /> "You need to provide the draft of the boat and the depth of the propulsion unit. If it's a <br /> 115hp unit, and you have MLW soundings at 1.4, that boat won't fit unless you have your <br />
The URL can be used to link to this page
Your browser does not support the video tag.