everything, the only thing might be Willowbend. No one followed up with them from the March <br /> meeting, so hell meet with Willowbend on Friday. <br /> Mr. Lyons asked what's tit for tat with Summerwood it they let us put a pump station in? <br /> Chris Gallagher said a betterment with 0% interest. Over 20yrs would come out to +/- <br /> $100/month,over 30yrs would be +/- $60/month. <br /> Anastasia Rudenko talked about the pre-qualification process. She said we have an aggressive <br /> schedule to give us flexibility with construction. The SRF loan requires a contractor by the end of <br /> June, we submitted the application one month ahead of schedule, and outstanding items will be <br /> submitted as they complete the initial review. <br /> Chris Gallagher asked about immediate items, like plan set revisions so we can get closer to <br /> bids. He said it might be quicker if he could sit down with someone for an hour or so rather than <br /> go through a group of multiple people during a review process. <br /> Anastasia Rudenko said the target to be"bid ready" is November 1st, <br /> Mr. Rapacz asked if one of the Commissioners needs to be on the Prequalification Committee. <br /> Anastasia said potentially 1 Commissioner and the Town Engineer. Chris Gallagher said possibly <br /> Catherine Laurent from DPW (if needed). Joe Lyons volunteered to be on the Prequalification <br /> Committee. <br /> Town Engineer Report— <br /> SRF Status, Takings Status, Condos: reviewed during Anastasia Rudenko's discussion. <br /> Willow Bend &Stratford Pond: We haven't started discussions with Stratford Ponds yet. <br /> Willowbend has been talking to us. Michelle Higgins already looked at it and will send Chris <br /> Gallagher a punch list of what is needed. She said we're at least 3-4 months out, he told <br /> Anastasia Rudenko we need to get these permits out. There's about 4 we need. Chris said <br /> there's no way we'll be ready to bid out in November, a lot should have already been done. We <br /> have to get a constructor by June. <br /> Ken Dunn said GHD's schedule says we can advertise or that 10/15/21. Chris Gallagher said that <br /> would more likely be done in January or February as it typically takes 90-120 days for any <br /> permit. <br /> Joe Lyons said we might be able to clear the ground and start digging in the spring. Chris <br /> Gallagher said there's a process once it's bid out before giving a notice to proceed. We might <br /> get a notice to proceed on "this portion"of the project. <br /> Plan Revisions Update: Chris Gallagher spoke about some changes he sent to GHD for the Sea <br /> Oaks design. Basically, the original design had about 2500ft on of sewer sunk deep on their <br /> property, it was expensive to a private customer. Carleton Street is right behind Sea Oaks, we <br /> don't need an easement. We can just run through their property and put a stump in. It's only <br /> about 30ft on their property and about 250ft in the woods. <br /> The Housing Authority is fine right now, they have a really high-tech nitrogen removal system <br /> that's working great. <br />