My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/09/1999 ZONING BOARD OF APPEALS Minutes
>
06/09/1999 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 5:01:09 PM
Creation date
1/11/2022 1:36:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
06/09/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f r f.Y <br /> y <br /> Board of Appeals Minutes--June 9, 1999 9 <br /> Mr.Nelson moved to grant a Variance of five feet from the frontage <br /> requirements and a � . <br /> Variance of 5 7,13 8 square feet from the lot size requirements, subject to criteria: 2,3,4 <br /> and findings:: 3 4 Mr. Guerrera sec g seconded. All agreed. �• _ <br /> Mr.Regan called for a short recess. . <br /> Mash-Pee Commons Limited Partnership Requests a Variance from Section 174-31 <br /> of the Zoning By-laws to vary the setback requirements on roe located in - <br /> q property aCl �. <br /> 5 <br /> zoning district at 3 8 Nathan Ellis Highway74 Block 20 Mash ee MA.�� p .�i <br /> Mashpee Commons Limited Partnership.--Requests minor revision of existing Special. �` s <br /> Permits(SP-86-04-024 and SP-99-14)for permission to relocate building aces square p g space q <br /> footage on property located in a C-1 zoning district at 3 8 Nathan.Ellis Highway <br /> (Map 74 Block 20), Mashpee, MA. ';,.•' <br /> Members sitting: James E. Regan IlI, Robert G.Nelson and James M.Dorgan. r <br /> Mr. Regan stated that he is a tenant of Mashpee Commons and is acting in the capacity of <br /> a municipal employee. He further stated that he receives no monetary benefit from the <br /> outcome of this hearing. <br /> Mr. John Renz, Vice President Mashpee Commons,L.P., and Randall Imai of � <br /> ImailKeller, Inc. Architects represented the applicant. Mr.Renz stated that the :# y <br /> advertisement in the Mashpee Enterprise was incorrect and the Variance relief <br /> p � bung <br /> sought is not for setback but for a height Variance. 4j* <br /> P 4 <br /> k t <br /> M Renz reminded the Board that at the Public Hearings on February 10, 1999,the <br /> Board approved the change of the square g g footage combining Bldg. and Bldg. ' r <br /> g g <br /> Mr. Renz submitted tables with the revised square footage of the two combined building F t <br /> as being 15,200. He stated that the applicant is asking for a change from 15,200 square ' <br /> feet to 17,600 square feet, an increase of 2,400 square feet. The reason for the change in �« <br /> the design of the buildingis to accommodate the Gap store. Gap proposes to vacate a ` <br /> . p, p p p their <br /> present location and turn the existing Gap Kids store into Banana Men. Gap will use the <br /> combined Building 15 for Gap Kids, Gap Baby, Gap Body underwear and regular Gap. �. .•s� '"�� <br /> k In <br /> i r <br /> 1+ <br /> Mr.Renz also submitted a draft of a decision compiled by Mr. Douglas Storrs,President <br /> of Mashpee Commons. <br /> Mr. Renz stated that Design Review has approved the project,with a minor revision on <br /> Building 24. T ` <br /> 4 <br /> The Variance relief being sought is for a five-foot increase in the height of the building. <br /> A <br /> Mr. Renz referenced the memo from the Planning Board that suggested that an engineer r, <br /> should be consulted to determine the parking requirements. ir <br /> � t <br /> a <br /> r `k lll I <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.