Laserfiche WebLink
The Town Planner suggested the Board consider a <br />reduction of said $45,000.00 based upon work that has <br />already been completed. <br />Mr. Megathlin stated he is pleased to learn that <br />Eastern Bank intends to make a partial improvement. He <br />noted however, that there is no mention of improvements to <br />the parting area in front of the hardware store. <br />Mr. Megathlin suggested the amount of the surety be <br />reduced to 2 oo.00 $ 000.00. <br />r. Rowley suggested the DPW Director verify the <br />figures for the Planning Board in order to avoid a <br />conflict, as he has been assisting the Bank in this matter. <br />The Town Planner acknowledged that the fees have been <br />paid. He asked for evidence that the special Permit <br />Modification had been recorded. <br />The Town Planner made reference to Condition #2 which <br />requires detailed'ite Plan and Building Elevation drawings <br />be submitted to the Planning Board for review and approval. <br />The Design Review Committee has reviewed and -approved the <br />overall protect. <br />The Town Planner suggested this Condition be modified <br />to include Buildings C and D with the understanding that <br />Applicant will appear before the Design Review Committee <br />for comments on the exterior details for sub fission to the <br />Planning Board. <br />Mr. Rowley suggested further details on the -site Plan <br />addressing surface runoff with regard to the incorporation <br />of brick paring, patios, walking areas, and other details. <br />r. Rowley explained he is concerned about the <br />immediate areas adjacent to the buildings. As you proceed <br />away from Route 28 the grade of the ground rises slightly, <br />there are 1i.ttle steps in the contours of the ground and <br />steps in the elevations of the floors. Due to these <br />conditions some transition areas are needed. Because the <br />buildings are going to be close together, he needs to <br />review the details. <br />