My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/05/2005 PLANNING BOARD Minutes
>
10/05/2005 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 5:27:29 PM
Creation date
1/19/2022 3:16:52 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
10/05/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
around the first of December. The foundation has been dug, <br />cleared, and the footings are in place. The Association <br />has agreed to assist the developer with coordinating the <br />transition of the post office boxes upon completion o:f the <br />building - <br />Mr. Gugliotta, representing the Association, requested <br />the Planning Board require the developer to post a bond in <br />the amount of Twenty -Five Thousand 2 ,o00.00) Dollars. <br />The Association and developer have agreed that the <br />final landscaping in this phase may require additional <br />topsoil, reseeding, additional trees and shrubs. <br />In this regard, the Association requests the Planning <br />Board to require the developer to past a bond in the amount <br />of Forty -Five Thousand , o00 . oo ) Dollars. <br />The Association does not have an opinion regarding the <br />catch basins, and is requesting these issues- be resolved <br />between the developer and the consulting Engineer. The <br />Association is requesting clarification that they would not <br />be held responsible for any future liability in this <br />regard. <br />Mr. Gugliotta feels that all outstanding issues have. <br />been resolved, and requested the Planning Board grant the <br />developer permission to complete the final 1 -units. <br />The Chairman asked about those trees that were to b <br />taken down, as discussed on the site visit. <br />The chairman recognized Toni Quinn, Windchime Point, <br />who informed the Board that a sample of the soil would be <br />provided tomorrow morning for testing. <br />Mr. Quinn reported the landscaping plan, as requested <br />by the Board, has not been provided, as it is his <br />understanding that Mr. Curra-n will supervise the plantings. <br />Tees will be provided for the three catch basins in <br />question by October 7, 2005. The tar has been removed from <br />said catch basins. The berm has been installed. <br />The large guardrail in Phase I I I has been installed <br />and bolted. The cement will be poured October 6, 200, at <br />which point landscaping will begin. Bern and stone have <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.