My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2013 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2010-2019
>
2013
>
02/13/2013 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:22:13 PM
Creation date
1/20/2022 2:21:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MASHPEE ZONING BOARD OF APPEALS <br />FEBRUARY 13, 2013 <br />MINUTES <br />This request is in compliance with the conditions of 1997 ZBA Decision which expires <br />on March 23, 2013. This is conditioned upon the Petitioner posting a $25,000 bond to be <br />held by the Town of Mashpee for potential removal of this tower. This Decision is <br />conditioned upon compliance with plan done for SBA Communications Corporation, One <br />Research Drive Suite 200 C, Westborough, MA 01581, and by Infingy Design Build <br />Deliver, stamped by Commonwealth of Massachusetts, signed by Chris J. Warren, <br />Registered Professional Engineer on December 10, 2012. The drawing is dated December <br />7, 2012. This extension is for another 15 years, through 2028. <br />Mr. Furbush seconds the motion. Votes: Mr. Furbush, yes, Mr. Blaisdell, yes, Mr. <br />Dorsey, yes, Mr. Reiffarth, yes, Mr. DeBarros, yes, all in favor. <br />William P. Tommasino and Deborah D. Thornton: Request a Written Finding under <br />§174-17 of the Zoning By-laws and M.G.L. Chapter 40A Section 6§ concerning <br />continuance, extension or alteration of pre-existing, non -conforming structures to allow <br />for construction of additions onto'a dwelling on property located in an R-3 zoning district <br />at 196 Waterway (Map 111 Parcel 96) Mashpee, MA. <br />• Sitting: Board Members Jonathan D. Furbush, William A. Blaisdell, Ronald S. Bonvie <br />and James Reiffarth and Associate Member John M. Dorsey. <br />Attorney Kirrane represented William Tommasino and Deborah Thornton who are the <br />owners of the property, situated along the waterway, in the New Seabury section of <br />Mashpee. This proposal calls for some modest additions to this pre-existing non- <br />conforming structure. The existing non -conformities relate to the side yard, the front <br />yard, and the setback from waters and wetlands. <br />Attorney Kirrane provided a photograph of the existing structure as well as a photograph <br />of structures that abut the property. The proposed additions are to the rear portion of the <br />deck and to the front entry way and over the existing deck. <br />The proposal will remain under the 20% lot coverage criteria. The existing as well as a <br />portion of the existing deck will be removed. <br />The existing spiral staircase that goes down into the basement area is in very close <br />proximity to the front door creating a dangerous condition. Altering the entry way would <br />eliminate that condition and allow for a ramp proposed for the front door and <br />construction of a small half -bath in that particular area that will be easily accessible for a <br />handicapped family member. <br />The Tomassino's are not increasing the non -conforming side yard setback. There will be <br />slight encroachment into the setback from the water and wetlands. Currently the front <br />yard setback is 29.8. With the proposal it will be 20 feet. <br />rd <br />
The URL can be used to link to this page
Your browser does not support the video tag.