My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/24/2013 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2010-2019
>
2013
>
04/24/2013 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 3:17:29 PM
Creation date
1/20/2022 2:59:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MASHPEE ZONING BOARD OF APPEALS <br />APRIL 24, 2013 <br />MINUTES <br />This is conditioned upon that the proposal is not substantially more detrimental to <br />the existing non -conforming structure. A new dwelling will be an improvement <br />and will conform to current building code requirements. It is compatible in size <br />and character to other structures in the neighborhood and there is sufficient <br />parking and setbacks as may be require. We also make reference to a Board of <br />Health Statement that this is in Zone II and the leaching facility will <br />accommodate up to five bedrooms. I also need to make reference to a plan <br />although this plan needs to be amended and contingent upon to include the <br />following: <br />• A driveway which depicts a maximum measurement of 14 feet wide in <br />and 14 feet wide out with no further work beyond the boundary lines of <br />the lot. <br />• The revised plan will depict the exact location of the driveway, the <br />proposed new raised patio and any other objects that may affect the lot <br />coverage, as well as the exact dimensions of the lot to be proposed and <br />submitted to the Zoning Enforcement Officer prior to construction. <br />• The plan designed for David M & Ana Ferris dated April 3, 2013, scale: <br />F'= 30', Cape & Islands Engineering, Mashpee, Mass, signed by David <br />Sanicki, will be revised and amended. <br />Mr. Blaisdell seconded the motion. Votes: Mr. Furbush, yes, Ms. Horton, yes, Mr. <br />Dorsey, yes, Mr. DeBarros, yes. All were in favor. <br />Jon Furbush asked Judy Horton to read the next hearing and the five regular <br />Board members will be present. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.