My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/04/2003 PLANNING BOARD Minutes
>
06/04/2003 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 5:07:43 PM
Creation date
1/21/2022 1:35:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
06/04/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Town Planner noted the leach pit appears to be <br /> encroaching on the buffer area which is not suppose to be <br /> disturbed. He also pointed out the impossibility of <br /> backing out of the last two to four parking spaces . <br /> Mr. ojale agreed to adjust the turning radius on these <br /> spaces . <br /> The Town Planner suggested the entrance to the project <br /> be reviewed much more carefully as this area is also <br /> potential signalised intersection, and any proposed parking <br /> spaces should be constructed correctly. He further <br /> commented that these plans have been presented on the spot, <br /> and that neither Staff nor the Consulting Engineer has had <br /> sufficient time for review. <br /> The Chairman agreed that the Board has repeatedly <br /> requested any/all proposed plans be provided at least one <br /> week in advance to insure proper and sufficienttime for <br /> review. <br /> The Board concurred with the Town Planner in that they <br /> would -require a reasonable amount o.f time for review of the <br /> plan and- that the_ Consulting E'ngineer. -be a,f-forded,sufficient time to review the plan and present comments to <br /> the Board. <br /> The Town Planner suggested a draft package be prepared <br /> for the next scheduled Meeting in preparation for a Note by <br /> the Board, provided however revised plans are submitted and <br /> the Cons-U-lting Engineer is satisfied; to which the Hoard <br /> agreed. <br /> There being no further Board or Public comment, the <br /> Chairman entertained a motion to continue. <br /> MOTION: Don Myers made a Motion to continue the <br /> Public Hearing in this matter to June 18, 2003, at 7 : o <br /> p. . ; which Motion was seconded by Dennis Balarini and so <br /> voted unanimously. <br /> Special Permit Modification <br /> Tindchi a Point, Inc. - Windchime Point Condominium <br /> Signature phasing Plan Special Permit Modification <br /> Approved April 2, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.