Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />SEPTEMBER 11, 2013 <br />• <br />MINUTES <br />Attorney Kevin Kirrane represented Robert and Marjorie Hackett requesting to raze and <br />replace an existing single family home. The plans have been updated since he submitted' <br />the original plans and has appended his written remarks that are more accurate. <br />He stated the entry way was removed from the Hamblin Pond side of the residence to the <br />Stanley Road side of the residence and the proposed building now has 1 foot overhang on <br />the second floor. He also provided photographs of the existing structure and structures that <br />are around the existing dwelling including a dwelling that was razed and replaced next <br />door. <br />The lot consists of 2,968 square feet and has approximately 72 feet of frontage along <br />Stanley Road. The lot constitutes a pre-existing non -conforming lot. The structure fails to <br />conform to the front yard setback because it was built across the property line is a pre- <br />existing non -conforming situation as is the rear setback which his 5.9 feet from the rear <br />property line. It does conform on the westerly side and on conforms on the easterly side <br />where the proposed septic system is being located. The existing building has been <br />developed with a two-bedroom single story residence and has an overall footprint of 769 <br />square feet and a portion of the 68 feet sits on the undeveloped way. <br />• Mr. Kirrane stated the entry way was removed on the updated plan from the Hamblin Pond <br />side of the residence and moved to the Stanley Road side of the residence The proposed <br />building now has a (1) one foot overhang on the second floor. He also provided <br />photographs of the existing structure and structures that surround the existing dwelling, <br />including a dwelling that was razed and replaced next door. <br />is <br />The proposal is to remove the structure that is sitting on blocks as opposed to a cement <br />foundation and will be built to current day code requirements. He indicated the proposed <br />structure is an improvement because it is being moved entirely within the lot. He stated the <br />new building will consist of a 28' x 24' on the first floor and 28' x 26' feet on the second <br />floor. <br />Mr. Kirrane stated the lot is narrow because of the 40 foot width and is making it impossible <br />to conform to the 40 foot setback requirement and 15 foot radiate requirement for current <br />day zoning. The proposal is also to create a front yard setback of 6 feet closer from the <br />structure to include the entry way on the front and 6 feet on rear which is better than the <br />5.9 feet that currently exists on the rear. In addition, the proposed structure will create a <br />new sideline non -conformity of (9) nine feet to its Westerly sideline, to accommodate Title <br />5 setback criteria. The parcel is situated in an R-3 Zoning District and does require front <br />yard setback of 40 feet and a side yard setback of 15 feet. <br />0 <br />