The FireDepartment-has recommended the use of sprinklers. Applicant has taken <br /> the position to not provide sprinkler systems as they are not required under the building <br /> -and,fire prevention codes for buildingjof this size. The-minimum building size-is 7500, <br /> the bank building is 4000. None of the Sovereign Bank buildings-in Massachusetts have <br /> a sprinkler system. Howe-v r, fire alarm systems will b& provided, to which the Fire <br /> Department is pleased. <br /> The Town Planner noted that the Planning Board'has,not received a written <br /> approval from the Fire Department. He also indicated that the bank building would be <br /> the only(free standing) building that would not have sprinklers, as all of the ther <br /> buildings at South Cape village have sprinklers. <br /> Mr. l riegathlin mentioned the pedestrian access and sidewalks at the Marshall's <br /> Building. Some concern:-has been expressed due to the fact there are no crosswalks at-the <br /> main entrance. References were made to the plan and Applicant has agreed to address <br /> the issue and.report to the Planning Board at a future meeting. <br /> Thomas O'Hara.staled his concern for parking impacts and direction of the <br /> existing crosslks. <br /> Mr. Megathlin stated it is necessary for additional crosswalks to what is being <br /> proposed at South Street and the existing crosswalk. <br /> Thomas O'Hara,stated the-suggestion was to-eliminate a crosswalk towards Route <br /> 28 and to provide a crossvral.k closer to the main parking area for safety purposes. The <br /> intent was to redirect pedestrian traffic impacted by the bank drive thru towards the <br /> Marshall's building. <br /> The Town Planner-expressed safety concerns for the-curb cut/handicap ramp that <br /> does not connect to anything and without a narked crosswalk into a fairly busy area, and <br /> without a sidewalk. <br /> Applicant agreed to further review/discuss the overall South Cape Tillage <br /> parking/walking safety aspects with the Consulting Engineer. <br /> Mr. l leg thlin then reviewed the Sign and Dimensional Waivers heeded to <br /> Approve Site Plan: Signs, Rear Yard Setbacks, Alternate Schedule of Dimensional <br /> Requirement for Open'Space Buffer, and Design Standards in the Site Plan Regulations. <br /> Mr. liegathlin concluded his presentation at this point. There was some <br /> discussion regarding the drive;thru exit left turn onto Charles Street..and traffic impacts <br /> such as visibility, elevations, and radius. Applicant agreed to review this matter with the <br /> traffic engineer. <br /> 11 <br />