Laserfiche WebLink
t <br /> , <br /> Page 2 <br /> Beverly Kane had a comment about the open space issue. She insisted that the open <br /> space still needed to be transferred. Torn Fudala explained about the process of signing <br /> over the land subject to conservation restriction. Beverly insisted that this needed to.be. <br /> done immediately. Tom Guinn agreed to have the deed in recordable form by <br /> December 1 #. <br /> Charlie Rowley y mentioned ar concern he had about his role as inspector to look at plans <br /> that have been approved and determining if they were c ut d properly. He feels that <br /> his role should not be to approve deviations; that this determination belongs solely to <br /> the Planning Board. There is Board consensus that the language in Condition 8 should <br /> reflect this. <br /> Torte Guinn said that they had hired an arborist to walk the site. He-asked why the <br /> Planning Board couldn't join in this walk through to make determinations about which <br /> trees could be cut. Torte Fudala said that it would be better to have a survey done and <br /> have Mr. Guinn come back and report to the Planning Board; this could be written into <br /> the special permit specifically. Martine said that Tom should work with Windchime to <br /> develop this language for the permit. <br /> Mary Scanlon, 1indhirne Trustee, requested a copy of whatever the proposed <br /> F modifications are. Mr. Bornstein agreed to provide this. Ills. Scanlon inquired about the <br /> regulations on boundaries. Torn Fudala said that Town Council wants concrete <br /> boundaries. There was some dispute as to whose responsibility boundaries are. Beverly <br /> suggested that language be put into the special permit. Arnie Ojalla said that this would <br /> take some time and that he doesn't have the.manpower right now to do this. Beverly <br /> insisted that this needs to be transferred to the town promptly. Arnie said he would <br /> provide a date that this would be done. Mr. Bornstein said he does not recall ever being <br /> required to bound before. <br /> It was decided to continue this public hearing to the next meeting of the Planning.Board <br /> n October 1 ". <br /> Prime domes# Release of Performance Guarantee <br /> Charlie received a copy of letter from Dave Siniki but said that he has not been out to <br /> the site to see the bound. Ken l larst rs said that the erosion has been swept away, <br /> catch basins have been cleaned out, street bounds have been set with street signs. He <br /> said he grants to bond the pavement. He mentioned the receding of shoulders and <br /> asphalt for catch basins. He also provided a list of what he was bonding for, a letter <br /> from Cape & Islands saying the bounds have been sett and presented a check in the <br /> account of$20, o .00; $11,866 final pave; 1,000 re-seeding or road shoulders; oo <br /> asphalt catch basins. <br />