Laserfiche WebLink
there is potential situation whereby it has been questioned whether or not a variance is <br /> needed when changing the non-conformity of setbacks and not just using a special permit <br /> to do so. Attorney Kirrane explains the application of the by-laws are such that these <br /> changes can be made thru the request of a special permit so long as the non-conformity <br /> already exists and the applicant is not creating a new one. <br /> Mr. Nelson suggests taking a foot off around the deck to keep the lot coverage at <br /> the original 23.3% since the Board is not happy with an increased lot coverage, albeit <br /> only .4%. The Board reviews the plans and makes suggestions on the how to reduce the <br /> addition. They also discuss the parking and it is decided that they want parking for 3 <br /> vehicles. They feel the boardwalk is impeding the parking issue. Attorney Kirrane tells <br /> the Board his client would agree to removing the small 35 square foot addition to reduce <br /> the lot coverage to 23.5% and he feels that is a very small increase. The Board agrees <br /> this world be acceptable but would like to have new plans drawn up to see the change in <br /> the boardwalk and the removal of the agreed square footage. The Board re-convened on <br /> August 26, 2009 to review the changes the Board required and met with Attorney <br /> Christoper Kirrane and Architect, Jerry Darrah. The new plot plan accommodated the <br /> changes and the applicant removed approximately 50 square feet of the addition to reduce <br /> the lot coverage to 23.5%. The Board made a motion to grant the Findings of Fact. <br /> SPECIAL PERMIT CRITERIA <br /> Section 174-17 of the Mashpee Zoning By-laws and Massachusetts General Laws <br /> Chapter 40A, Chapter 6, require a"Findings of Fact"that the extension, alteration or <br /> removal shall not be substantially more detrimental to the neighborhood than the existing <br /> non-conforming use. <br /> GENERAL FINDINGS <br /> 1. that the subject property is located at 21 Bowsprit Point and contains 15,000 <br /> square feet. <br /> SPECIFIC FINDINGS <br /> The Board determined that: <br /> 1. the proposal will not be substantially more detrimental to the neighborhood <br /> than the prior non-conforming structure and its use.. <br />