Laserfiche WebLink
0 <br />• <br />Maslipee Zoning <br />Board of Appeals <br />2 <br />Minutes <br />November 12, 2008 <br />3) Firewall Separation — Inspected by Building Commissioner, Richard <br />Stevens. <br />4) Waste Oil Container: Mr. Beaulieu contacted the Fire Department and <br />has applied for the permit required by the Fire Department. Mr. <br />Beaulieu will comply with Fire Department regulations. <br />5) Septic System: Mr. Silva has increased the size of the soil absorption <br />system from 444 gpd to 599 gpd; 150 gpd would be designated for <br />Unit #5. The remaining 449 gallons would be divided between the <br />remaining 5 units on a pro -rated basis because each unit varies in size. <br />The work has been completed. <br />6) Parking Lot: Mr. Silva applied for a Special Permit modification asking <br />that he be given one year from the date of the permit issued to install <br />the topcoat and stripe the parking spaces. <br />7) A revised plot plan was submitted showing the relocation of the <br />handicapped parking spaces and the fenced -in dumpster. <br />The ZBA has informed both Mr. Silva and Mr. Beaulieu that the above mentioned <br />items are to be completed no later than December 31, 2009 or the Special <br />Permit for the entire building will be recinded. They have been more than <br />patient since 2004 for these items to be completed — there will be no exceptions. <br />The Board will move to grant the Special Permit for the repair shop and for the <br />modification of the special permit to Mr. Silva with these measures in place. <br />Both Mr. Silva and Mr. Beaulieu fully understand the requirements and agree to <br />have them completed by the implemented date. <br />The permits are also contingent on Hazardous Waste approval from the Fire <br />Department. <br />Mr. Stevens informs the Board that he went to the site to inspect the fire walls <br />and found them to be in compliance. He also mentioned that it was one of the <br />neatest auto body shops around. <br />The Board asks Mr. Beaulieu if he has contracted with anyone for the oil removal <br />yet. He has made some phone calls but to date.has not officially hired anyone. <br />He is presently not doing any oil changes. <br />Robert Nelson makes a motion to grant the Special Permit to Mr. Beaulieu for the <br />auto body shop. William Blaisdell seconds the motion. All agree. So moved. <br />