Laserfiche WebLink
• <br />• <br />0 <br />Zoning Board of Appeals <br />Minutes <br />November 28, 2006 <br />The Desian Approval Process: <br />The ZBA Board received a draft document prepared by Special Counsel <br />entitled "The Design Approval Process" relative to Hiles and regulations <br />governing the Jobs & Whitings neighborhood design review process. <br />It was agreed the design review document be reviewed at the next <br />meeting. The architect was requested to attach examples of housing by <br />type for additional review. <br />Decision on Comprehensive Permit Application: <br />A new draft of the Decision on Comprehensive Permit Application <br />proposed by Special Counsel was distributed. <br />Ongoing issues discussed at the October 12`s meeting were considered. <br />DECISIONS AND CONDITIONS: <br />13. Final Site Plans re: Drainage/Stormwater Management: HELD <br />Requirements to be imposed by Town Engineer <br />8. Dumpster Locations: Dumpsters are not provided for single family <br />homes. Final dumpster locations will not obstruct or eliminate a <br />parking space. Trash shall be stored in a covered container in the rear <br />of the lot. One private contractor would be hired and coordinated by <br />the homeowners association to collect the trash. Pick-up shall be <br />scheduled at least 2x per week. Single family homes can elect to have <br />their trash collected or shall maintain responsibility for disposal unless <br />and until the Town assumes formal responsibility. RESOLVED. <br />