My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/02/2021 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
12/02/2021 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 5:00:27 PM
Creation date
2/8/2022 11:40:51 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/02/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H.' <br />Community Preservation Committee <br />Minutes <br />December 2, 2021 <br />Ava Costello <br />Application: HVAC Unit for One -Room Schoolhouse: $19,680 (continued) <br />Last year 177 persons visited the schoolhouse. Installing a split HVAC system would make the <br />environment more comfortable in a climate -controlled setting during the summer months, and in <br />the fall with openings for school visits and on special dates such as Memorial Day, Veterans Day <br />and Indigenous Peoples Day. <br />The unit is proposed to blend into the wood beams on the back wall with piping to be contained <br />in a false ceiling to maintain the buildings historic appearance. The heat and air system would <br />operate only when the schoolhouse is in use for energy efficiency. It is anticipated the utility <br />costs would be assumed under the Archives building budget through the Town Manager's <br />Office. <br />The Mashpee One Room Schoolhouse is one of the few historic places in the Town of Mashpee <br />on the National Register list. <br />It was noted the Director of Public Works assisted in the project estimate. There is no bid <br />requirement since the project cost falls under $25,000. It is expected that DPW labor would <br />complete some of the work requirements. The remainder would be done under annual contract <br />by mechanical vendors. With CPA approval the project would be completed in July 2022. <br />The historic schoolhouse is exempt from ADA compliance and it is not wheelchair accessible. <br />It was suggested a temporary ramp be considered. <br />Application: Mashpee War Monument Project: $86,000 <br />Ava Costello and Richard DeSorgher discussed additional funding requests to complete the <br />Mashpee War Monument. The project received $317,500 in CPA funding with $15,000 in MHC <br />grants. The additional funding request of $86,000 would be added to the $177,981.63 available <br />budget to purchase a solid granite monument with the Veteran names, conflicts and dedication <br />along with medallions depicting the Military branches and new Town Seal. Work includes <br />delivery and installation, an electrical and landscape budget as well as project contingency. <br />The goal of the project remains the same. To honor, recognize and pay tribute to all Veterans <br />from Mashpee to make sure their service and sacrifice to our country is made visible and never <br />forgotten. <br />With CPA funding construction of the monument would begin in the spring of 2022 with <br />completion in early summer, and a Town -wide dedication and celebration in the fall of 2022. <br />
The URL can be used to link to this page
Your browser does not support the video tag.