Laserfiche WebLink
Charles L. Rowley &Assoc;cates <br /> CIVIL. ENGINEERS & SURVEYORS <br /> SITE EVALUATION LAND SURVEYING <br /> SITE DESIGN ENVIRONMENTAL <br /> CONSTRUCTION LAYOUT TITLE S DESIGN <br /> 2229 CRANBERRY HIGHWAY TEL:(508)295-0545 <br /> POST OFFICE BOX 9 FAX:(508)295-1192 <br /> WEST WAREHAM,MA 02576 <br /> February 19, 2004 <br /> Town of Mashpee Zoning Board of Appeals <br /> Town Hall <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 Re:Southside Realty Trust, MGL Ch.40A <br /> Comprehensive Permit Application <br /> Engineering Review <br /> Dear Board Members: <br /> I have reviewed the following documents relative to the above application for a <br /> Comprehensive Permit for property on Route 130. <br /> 1. Application booklet from Southside Realty Trust dated January 21, 2004 <br /> 2. Stormwater Management and Drainage Narrative and Wastewater Treatment <br /> System Narrative by Horsley &Witten, Inc. dated November 10, 2003, <br /> 3. Plan S-1 entitled: "Preliminary Plan, Main Street Village, Route 130, Mashpee, <br /> MA" dated 11/06/03, revised 12/15/03 by Warwick &Associates, Inc., <br /> 4. Plans S-2 and S-3 entitled: "Main Street Village, Proposed Site Development <br /> Plan, Lettie Lane (Route 130 Property)" dated 10/09/03, revised 12/10/03 by <br /> • Horsley &Witten, Inc. <br /> I have the following comments and questions concerning the referenced <br /> documents. <br /> I. Application Booklet <br /> Section 1: Under Assessment of Natural Resources in the Vicinity of the Site <br /> The next to last sentence suggests an adjacent intermittent stream falls within <br /> the jurisdiction of the Rivers Protection Act. It is assumed this is in error and in <br /> fact does not fall under Rivers Act jurisdiction based on the evidence presented. <br /> Section 3: <br /> A. Several requests for relief from the requirements of the Mashpee Zoning <br /> By-Law are presented. Please explain the need for relief of Section 174- <br /> 12. <br /> B. Section 174-40 states that there should be a minimum of 200' separation <br /> of street centerlines on intersecting streets along Route 130. Why is relief <br /> from this section being requested? It appears not to be needed. <br /> C. There are several requests for relief from the Design Standards of the <br /> Mashpee Subdivision Rules and Regulations. Most of the Section VII <br /> standards relate to roadway safety and the general design standards that <br /> will contribute to vehicle and pedestrian safety. Please explain why these <br /> general standards cannot be met without significant cost to the developer. <br /> Section 4: <br /> A. Page 8 of the Executive Summary indicates an assumption that <br /> Goodspeed Meetinghouse Road will be brought up to Mashpee <br /> Subdivision standards. Is this an early assumption that is not to be done? <br /> • If certain improvements are to be done what will they be? <br />