Laserfiche WebLink
Meeting Minutes <br /> Plan Review Committee <br /> Tuesday, May 17.2022 <br /> KHmshpee Town Hall Wa4uoltMeeting Room <br /> Mr. gjqMhqKqOgLofl, <br /> He reviewed the Title 5 plan and the plan for the drainage retention area. Board of Health requires a <br /> sub-surface component forNha retention basin so there is no standing water, or at least prolonged <br /> standing wabar. The septic system is underneath pavement and requires a Tide 5Vurianne. He wanted <br /> to know if the design quote included office and showroom space for commercial or retail. <br /> Mr. Junqueina said at this time they are only applying for warehouse apace to review the budget. A <br /> separate proposal will be filed for another time. For now, it is strictly a warehouse. <br /> Mr. Harrington said that sizing the septic system would aUmw59g gallons a day before600 gallons <br /> would require denite system. Currently it looks like there is only 340'360 gallons o day. There would <br /> be more flexibility to design fully out to the 509 as far as the uses into the building. He always <br /> recommends the denite because you are not restricted on the property. This will require a filing with the <br /> Board mf Health Board for septic approval. <br /> Mr.Evan Lehrerjown Planner <br /> He spoke to Joao and mentioned that the location of the parking at the facility requires a discussion with <br /> the ZBA and at their discretion will determine the parking along the side and front. The applicant should <br /> be prepared bo make that case. <br /> Mr.Jack Phelan,Fire Chief <br /> He asked if there will be painting in the future, the building will require fire protection fora spray booth <br /> and an a|onn system. A sprinkler system is not required but keep in mind a dust collection system for <br /> the furniture making. <br /> Joao said that he will schedule m meeting with the Fire Department. <br /> Mr. Dave Morris.Buildina Commissioner <br /> He asked Joao what iothe standard fire mepenmUone between the baye. Joao said it is one hour. Dave <br /> said that they may need to be upgraded to two hours especially where there is no sprinkler system. <br /> Mr.Drew McManus,Copjqp%fiq�� <br /> No comments. <br /> He said that Glen answered the questions regarding the infiltration system and retention basin. If the <br /> rear is to be paved, it may require the drainage calculations to be revised or expand the trench. <br /> 2 <br />