Laserfiche WebLink
6:03 Peninsula Council, 0-RS RE Rock Landing Road (Frog Leap Pond). Proposed NOI <br /> <br />treatment and eradication of invasive aquatic vegetation. <br /> <br />Charles McCarthy and Keith Gazelle from Solitude Lake Management presented plans. <br /> <br /> Agent said there’s not much to add, herbicides equal long-term control. He asked how long <br /> <br />the initial treatment would be effective. <br /> <br />Charles McCarthy said it should last the rest of the season, we’ll follow up and spot treat if <br /> <br />necessary. <br /> <br /> <br />Agent asked him to describe the methodology of applying the herbicide. <br /> <br />Charles McCarthy said it’s placed in a mixing tank and diluted with water from the pond. It’s <br /> <br />distributed by a boat in the areas we spotted the plants. <br /> <br />Agent said not too much to add, Solitude Lake Management has significant experience, <br /> <br /> <br />and this is what they specialize in. We can condition for advance notification before <br /> <br />application. Recommends close and issue. <br /> <br />Mr. Colombo asked if the two other chemicals are included with the initial application? <br /> <br />Charles McCarthy said yes, 3 chemicals included in the application. <br /> <br /> <br />Frank Gazelle clarified they are included in the program as a contingency, but may not <br /> <br />need to be used. The focus of the application is just the one chemical. <br /> <br />MaryAnn Gansmiller, an abutter, and member of the Committee that maintains the pond, <br /> <br />made a public comment that they are happy this is happening. <br /> <br /> <br />Mr. Dalton motioned to close and issue. <br /> <br />Mr. Weeden seconded the motion. <br /> <br />Vote: 5-0-0 <br /> <br /> <br />Roll Call Vote: <br /> <br />Ms. Zollo; yes <br /> <br />Mr. Weeden; yes <br /> <br />Mr. Dalton; yes <br /> <br /> <br />Mr. Colombo; yes <br /> <br />Mr. Smith; yes <br /> <br />In favor, 5; Opposed, 0; Abstentions, 0 <br /> <br /> <br /> <br />David M. & Ana S. Ferris, 36 Seconsett Point Road. Proposed dredging and <br />6:06 NOI <br />expansion/modification of pier, ramp and float. Representative: Cape & Islands <br />Engineering, Inc. (Continued from 3/24 for further info/discussion) <br />Mr. Dalton motioned to continue at the request of the applicant to 4/28/22 at 6:09pm. <br />Mr. Colombo seconded the motion. <br />Vote: 5-0-0 <br />Roll Call Vote: <br />Ms. Zollo; yes <br />Mr. Weeden; yes <br />Mr. Dalton; yes <br />Mr. Colombo; yes <br />Mr. Smith; yes <br />In favor, 5; Opposed, 0; Abstentions, 0 <br /> <br />