Laserfiche WebLink
6:15 Paul M. & Helen C. Zammito, Trustees, 4 Spoondrift Circle. Proposed construction of NOI <br />swimming pool / retaining walls, permitting and relocation of existing patio, shed and <br />mitigation plantings. <br />Andrew Garulay from Yarmouthport Design Group on behalf of BSS Design, Inc. presented <br />plans. <br />Agent said they did a good job addressing the unpermitted shed and patio. They were able <br />to keep the pool out of the 150ft setback. Project meets performance standards, net <br />environmental benefit. He recommends close and issue. <br />Assistant Agent read Board of Health and Building Department comments. <br />Mr. Smith said it’s an impressive mitigation arrangement. <br />Mr. Dalton motioned to close and issue with the condition of monitoring and <br />maintenance of mitigation. <br />Mr. Colombo seconded the motion. <br />Vote: 5-0-0 <br />Roll Call Vote: <br />Ms. Zollo; yes <br />Mr. Weeden; yes <br />Mr. Dalton; yes <br />Mr. Colombo; yes <br />Mr. Smith; yes <br />In favor, 5; Opposed, 0; Abstentions, 0 <br /> <br />