Laserfiche WebLink
There being no further comments or discussion, Mr.Virgilio motioned to approve the draft Sewer <br /> Regulation as presented. Motion seconded by Brian Baumgaertel. Roll call vote Ernest Virgilio <br /> (yes); Brian Baumgaertel (yes). VOTE: Unanimous(2-0). <br /> 4. Review of Septic Design Plan — 19 Punkhorn Point Road. Ms. Willander stated that this plan <br /> proposes to add a pump chamber, force main and connection of proposed garage to existing <br /> system. The system profile note regarding unsuitable material should say Note 8, not Note 9; <br /> alarm and pump should be on separate circuits; and a riser should be shown on the d-box. <br /> Mark Dibb, engineer from Cape and Island Engineering, introduced himself for the record and <br /> took questions from the Board. Mr. Dibb stated that the client is proposing a detached garage to <br /> store two vehicles, and an area for fixing fishing equipment. A lower level bathroom with toilet <br /> and sink is also proposed. There is an unfinished upstairs, with a deck. An ejector pump, tying <br /> into a gravity line coming out of the house to a new four-bedroom leach field, is proposed to <br /> repair an existing leach field. Mr. Dibb stated that the upstairs space is completely unfinished and <br /> uninhabitable,and will be utilized for storage only. <br /> There being no further comments or discussion, Chair Baumgaertel motioned to approve the <br /> septic plan for 19 Punkhorn Point Road with the following conditions: 1)the system profile must <br /> show a riser on d-box;2)the Note 9 reference to unsuitable material should say Note 8;3)ejector <br /> pump model shall be changed to not indicate a grinder pump; 4) a note must be added that the <br /> alarm and pump will be on separate circuits; 5)thrust blocks should be added on the force main. <br /> Motion is seconded by Ernest Virgilio. Roll call vote: Ernest Virgilio (yes); Brian Baumgaertel (yes) <br /> . VOTE: Unanimous(2-0) <br /> 5. Review of Septic Design Plan — 11 Jonas Drive. Ms. Willander commented no variances were <br /> requested or need; however,the site plan needs to show the dimensions of the SAS. <br /> There being no further comment or discussion,Brian Baumgaertel motioned to approve the septic <br /> plan for 11 Jonas Drive with the condition that the overhead site view show the dimensions of the <br /> SAS. Motion seconded by Ernest Virgilio. Roll call vote: Brian Baumgaertel (yes); Ernest Virgilio <br /> (yes). VOTE: Unanimous(2-0). <br /> 6. Review of Relocation Plan—44 Popponesset Island Road- Ms.Willander commented that a tank <br /> relocation is usually approved by BOH staff, but came in with a full scale plan rather than an as- <br /> built. Mr. Dibb,engineer from Cape and Island Engineering,introduced himself for the record and <br /> took questions from the Board. He explained that this is an existing four-bedroom dwelling being <br /> replaced with a new four-bedroom dwelling. Proposed attached garage is within 10 feet of <br /> existing tank;therefore,they are proposing to move the tank to an area that meets the required <br /> setback and keep the existing leach field installed in 2015. Chair Baumgaertel asked for profile or <br /> as-built for installer to use. Mark stated that they can provide that. <br /> There being no further comment or discussion,Brian Baumgaertel motioned to approve the septic <br /> tank relocation plan for 44 Popponesset Island Road with the conditions that the profile view <br /> indicate the components being modified, as well as the number of existing and proposed <br /> bedrooms. An as-built shall be submitted prior to issue of Certificate of Compliance. Motion <br /> seconded by Ernest Virgilio. Roll Call Vote: Brian Baumgaertel (yes); Ernest Virgilio (yes). VOTE: <br /> Unanimous(2-0) <br />