My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/22/2023 ZONING BOARD OF APPEALS Minutes
>
02/22/2023 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2023 5:00:33 PM
Creation date
3/23/2023 4:08:23 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
02/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEETING MINUTES <br /> MASHPEE ZONING BOARD OF APPEALS <br /> FEBRUARY 22, 2023 <br /> Mr. Furbush confirmed that these additions are not expanding into the setbacks. <br /> Mr. Bonvie asked Mr. Bunker if he excluded flood plain, wetlands, coastal bank etc. from his <br /> calculations of lot coverage. Mr. Bunker said that his calculations were for the upland area. There <br /> are no wetlands on the lot. <br /> Mr. Blaisdell said that the Board will require existing and proposed calculations depicted on the <br /> site plans regarding flood plain,wetlands, coastal bank, etc., and depicting the percent lot coverage <br /> requirement in the bylaw, i.e., 20%requirement in the R-3 District. <br /> This particular lot is located under the New Seabury Special Permit; however, the Building <br /> Commissioner now requires these projects to apply under Section 174-33 setbacks to wetlands. <br /> The existing lot coverage on the site plan is 12.83%but does not include the wetlands calculations <br /> or Land Subject to Coastal Storm Flowage. <br /> Mr. Bonvie read the Conservation Department comments dated February 6, 2023 into the record. <br /> "Commission approved this project with condition of mitigation plantings and removal of existing <br /> platform deck near edge of pond. This platform deck is actually not on the applicant's property but <br /> rather on New Seabury Properties open space land." <br /> Ms. Sangeleer read the Board of Health comments dated February 13,2023 into the record. "Health <br /> Department is ok with the addition of a dining room(not to be used as a sleeping room) and the expansion <br /> of the Kitchen. There will be no increase in bedrooms. The existing septic permit states that a 5-bedroom <br /> septic is provided. The property is in Zone II so the dwelling is restricted to 5 bedrooms." <br /> The Board had a discussion and all agreed that the site plans should be revised. <br /> Mr.Bunker requested a continuance until March 8,2023 to revise his calculations on the site plans. <br /> Mr.Bonvie made a motion that the hearing be continued until March 8,2023. Mr. Gould seconded. <br /> All were in favor. <br /> Sitting on this hearing are the four regular Board members and Associate Member, Sharon <br /> Sangeleer. <br /> 61 Seconsett Island Road: Owners, David J. DiSciullo and Elyse S. DiSciullo request a Written <br /> Finding under §174-17 of the Zoning Bylaws to allow for relocation of existing single family <br /> dwelling, and construction of a garage on property located in an R-3 Zoning District, Map 119 <br /> Parcel 3, Mashpee, MA. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.