Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> MARCH 8, 2023 <br /> Charlie, yes <br /> Jim yes <br /> Bill yes <br /> Jon yes <br /> Ron, no <br /> The Special Permit passed four to one in favor(4-1). <br /> 425 Nathan Ellis Highway: Owner, Mashpee 151 Properties, LLC requests a Modification to an <br /> existing Special Permit (SP-97-73) under §174-24 (C) (9) and §174-17 of the Zoning Bylaws to <br /> allow for construction of a 1,800 sq. ft. addition to the rear of the existing retail building on <br /> property located in an R3 and C2 Zoning District(s), Map 72 Parcel 56, Mashpee, MA. <br /> Attorney Christopher Kirrane represented the applicant requesting a Modification to an existing <br /> Special Permit. Also present was Mark Dibb, Cape & Islands Engineering. The Special Permit <br /> allowed for an expansion of the building and signage. The request is to expand the rear of the <br /> building 1,800 sq. ft. for additional cooler space and office space. The property is located in the <br /> C2 Zoning District and the R3 Zoning District. The lot is surrounded on all four sections by roads. <br /> The building is pre-existing non-conforming because it does not meet the front road setback to <br /> Rte. 151, Wampanoag, or Massasoit Roads. The rear of the building does meet the setback to <br /> Sassacus Road. The proposed condition will not create any new non-conformities, nor will it <br /> intensify the existing non-conformities. The new addition will not be any closer to Rte. 151, <br /> Wampanoag, or Massasoit Roads than what currently exists. The addition will be getting closer in <br /> the rear but is still a conforming condition at 170 ft. from that road. The lot coverage will increase <br /> from 11.7% to 14.7%, but well under the 20% allowed. There is fifty six (56) parking spaces <br /> required, and there are 56 spaces available. There will be some reconfiguration in the rear of the <br /> parking. There is a retention area being built as noted on the site plan. <br /> Mr. Dibb said a drainage basin will handle the new pavement area, and will handle the existing <br /> pavement area. <br /> Attorney Kirrane was aware of an abutter who is concerned about the new addition encroaching <br /> her property. He pointed out the existing screening that is on the property and is remaining. <br /> Mr. Dibb said that the basin will be built along the property line. There 40 ft. of property that will <br /> be untouched. The actual clearing is about 100 ft. from the abutter's property. Mr. Dibb pointed <br /> out the closest point of the addition to the abutter's property. <br /> Mr. Dibb described the basin as a depression in the ground, and provides a catch basin for <br /> underground storage in the same footprint of the basin. <br /> 10 <br />