My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2023 ZONING BOARD OF APPEALS Minutes
>
03/22/2023 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 5:00:45 PM
Creation date
4/21/2023 3:57:52 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AS PEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> March 22,2023 <br /> Attorney Steve Guard requested a continuance until April 26, 2023. Mr. Bonvie made a motion <br /> that the Board accept the applicant's request. Mr. Gould seconded. Mr. Reidy, yes, Mr. Gould, <br /> yes, Mr. Goldstein, yes, Mr. Bonvie, yes, Mr, .Furbush, yes. All were in favor. <br /> Sitting on this hearing are the four regular Board members and Associate Member, Brad Pittsley. <br /> 411 Monomoscov Road: Owner, MT Guard, LC requests a Special Permit under §174-17.1 of <br /> the Zoning Bylaws to raze and replace a pre-existing,non-conforming single-family dwelling with <br /> a detached garage and second floor accessory apartment on property located in an R-3 Zoning <br /> District, Map 12413arcel 61-0, Maslipee, A. <br /> Attorney Steve Guard represented the application for a. Special Permit request. Also present was <br /> Raul I...izardi-Rivera, with Cape & Islands Engineering. The property is non-conforming for the <br /> frontage at 50.2 11. and the lot size is non-conforming at 14,884 sq. �ft. The existing dwelling is <br /> non-conforming at 3.8 ft., and 3.9 ft. from the existing shed. The property is also non-conforming <br /> because of the flood plain. The existing structure coverage is 6%, the existing dwelling is 900 sq. <br /> ft. The proposed lot structure coverage is 19%, at 2,776 sq. ft. The proposed garage is 576 sq. ft. <br /> The Board has to make findings that the increase of the lot structure coverage is not substantially <br /> more detrimental than the existing lot structure coverage. The Attorney has not received the <br /> architectural plans for the presentation, and will be requesting a continuance for this petition. The <br /> Board needs to find that the proposed dwelling and garage will not be substantially more <br /> detrimental to the neighborhood. <br /> Mr. Rivera mentioned that the proposed project is within the 100 ft. buffer zone and was approved <br /> by Conservation with an order of conditions. This project included mitigation plantings within the <br /> 100 ft. buffer zone. The existing Title 5 septic system is being removed, and replacing it with a <br /> new enhanced five bedroom approved septic system. The proposed garage is a one-car garage. The <br /> proposed house has to meet flood zone requirement construction, and the house will have to be <br /> one foot higher than the flood plain. At elevation 13, the first floor has to be at least elevation 1.4. <br /> The applicant would like to utilize the space underneath as a car-port. The first floor is nine feet <br /> above that space. The house and garage will have flood vents. The shed does not require flood <br /> vents. The grade will be slightly raised to install the new septic system. <br /> Attorney Guard said that there will be living space above the garage for this application. <br /> Mr. Bonvie mentioned that the applicants need to meet with the Building Commissioner regarding <br /> the proposed living space above the garage. <br /> Mr. Morris mentioned that since the shed is over 200 sq. ft. needs to be brought up to building <br /> code, and requires flood vents, and should have a 15 ft. setback but it's up to the Board to decide. <br /> Mr, Bonvie asked if the applicant is creating any new non-confonnities, The Board noticed that <br /> there are two new non-conformities. The proposed shed is on the lot line, and needs to be 15 ft. <br /> Mr. Bonvie also mentioned that the lot coverage needs to be revised for the pre- and post- <br /> structures. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.