MEETING MINUTES
<br /> MASHPEE ZONING BOARD OF APPEALS
<br /> AP 1.2, 2023
<br /> The Board had a discussion and would like the Building Commissioner to keep track oft e O&M
<br /> Plan for this property. Mr. Bonvie offered to help with this effort.
<br /> Ms. Sangeleer read the Conservation Department comments into the record; "Not in wetlands
<br /> jurisdiction", and Board of Health comments; "a Title 5 inspection is required for increase of
<br /> footprint of facility", and the Fire Chief comments that he is satisfied with Mr. Pesce's report.
<br /> There were no further comments from the Attorney. There were no further comments from the
<br /> Board or audience.
<br /> Mr. Forbush asked for a motion to close the public hearing to comments. Mr, Bonvie made a
<br /> motion to close the public comments, Mr. Blaisdell seconded, yes. Ms. Sangelcer, yes, Mr.
<br /> Goldstein, yes, Mr. Bonvie, yes, Mr. Blaisdell, yes, and Mr. Furbush, yes. All were in favor.
<br /> There was no further discussion,
<br /> Mr. Bonvie made a motion that the Board issue a Special Permit Modification to Owner,
<br /> Mashpee 151 Properties, LLC, to an existing Special Permit (SP-97-73) under §174-24 (C) (9)
<br /> and §174-17 of the Zoning Bylaws to allow for construction of a 1,800 sq. ft. addition.to the rear
<br /> of the existing retail building on property located in an R3 and C2 Zoning District(s), Map 72
<br /> Parcel 56, Mashpee, MA with the following conditions:
<br /> I. The Board has determined that the applicant meets all the conditions of a Modification to
<br /> a Special Permit under Mass General Law 40A Section 9®
<br /> 1 Site Plans — Prepared for Mashpee Properties LLCM, Project: 425 Nathan Ellis Hwy,
<br /> Maslipee, MA. Date: February 3, 2023. Scale: I" = 20', Page 1: Existing Conditions,
<br /> Page 2: Layout Plan, Page 3: Grading and Drainage Plan, Page 4: Photometric Plan, 5:
<br /> Detail Sheet. Rev. Date: 3/29/2023: Add Photometric, Misc. Revs Per Comments.
<br /> Prepared by: Cape & Islands Engineering,
<br /> 3. Drawing Plans: Addition to: Andy"s Market, 425 Nathan Ellis Hwy., Mashpee, MA.
<br /> Date: 01/31/2023,Drawing Title: Existing Elevations,Drawn by:JJM,Project No.: 2304,
<br /> Sheet No.: AB As-built, Sheet No,: Al Drawing Title: Proposed Elevations, Schematic
<br /> Design. Prepared by: Giampietro Architects, Stamped and Signed by: Louis F.
<br /> Giampietro,No.: 4929, Registered Architect, Falmouth, MA.
<br /> 4. Conditioned on all Town Department comments,read into the record.
<br /> 5. Conditioned on Pesce Engineering & Associates peer review report dated March 20,
<br /> 2023,as well as all Mr. Pesce's additional comments submitted,including but not limited
<br /> to the Fire Chief corninents read into the record.
<br /> 3
<br />
|