Laserfiche WebLink
<br />MASHPEE ZONING BOARD OF APPEALS <br />MEETING MINUTES <br />MAY 10, 2023 <br /> <br />3. Floor Plan – Project Name: Pastore Excavation, 40 Evergreen Circle, Mashpee, MA. Date: <br />1/25/23, Scale: 3/16” = 1’, Prepared by: Priggen Steel, Wrentham, MA. Stamped by: <br />Theodore C. Greenlaw Professional Engineer No. 29093. S1 thru S-6. Revised S-2: <br />Depicting Shutters Added On Windows. <br /> <br />4. Conditioned on all Town Department comments read into the record including but not <br />limited to the Fire Department and Board of Health. <br /> <br />5. Conditioned on the recommendations from the Design and Plan Review Committees read <br />into the record at the ZBA meeting on April 26, 2023. <br /> <br />6. Conditioned on Pesce Engineering & Associates peer review report dated April 20, 2023, <br />and May 5, 2023. <br /> <br />7. Prior to the request of a building permit, the applicant shall issue a working capital account <br />in the amount of $5,000. The check shall be issued to the Town of Mashpee to be utilized <br />to pay for the initial peer review, and for future peer review inspections and signoffs. <br /> <br />8. Any changes in the use of the building bays will require an application with the Zoning <br />Board of Appeals. <br /> <br />Mr. Ganzenmuller seconded, yes, <br />Mr. Reidy, yes, <br />Mr. Caggiano, yes, <br />Mr. Goldstein, yes, <br />Mr. Furbush, yes. <br />All were in favor to issue a Modification to the Special Permit. <br /> <br />40 Evergreen Circle: Petitioner, Pastore Excavation, Inc. requests a Variance from the front yard <br />setback under §174-31 (Land Space Requirements) of the Zoning Bylaws to allow for construction <br />of a metal commercial building with contractor bays on property located in the I-1 and Light <br />Industrial Overlay District(s), Map 19, Parcel 10-4, Mashpee, MA. (Owner of record: Chapter <br />Closed, LLC) with the following conditions: <br /> <br />1. The Board has determined that the applicant meets all the conditions of a Variance under <br />Mass General Law 40A Section 10. <br /> <br />2. Proposed Site Development Plan, Prepared for: Nicholas A. Pastore, Project: 40 Evergreen <br />Cir. Mashpee, MA, date: March 10, 2023. Page 1: Cover Sheet, Page 2: Existing <br />Conditions, Page 3: Layout Plan, Page 4: Grading & Utility Plan, Page 5: Septic Plan, Page <br />6: Construction Details. Prepared by Cape & Island Engineering. Stamped and signed by <br />Mark Dibb, No: 45937. Revised Page 1 of 6: Date: 4/25/23: Move 4 Spaces, Add <br />Landscaping, Revised Page 5 of 6: Date: 4/28/23: Add Test Pit Data. O&M Plan Dated: <br />April 28, 2023 and signed by applicant. <br />10 <br /> <br /> <br />