Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JUNE 28, 2023 <br /> Mr. Caggiano, seconded, yes, <br /> Mr. Reidy, yes, <br /> Mr. Bonvie, yes, <br /> Mr. Blaisdell, yes, <br /> Mr. Furbush, yes. <br /> All were in favor to issue a Written Finding. <br /> 25 Tide Run: Owners, Patrick J. and Nissa R. Knight request a Written Finding under §174-17 <br /> and §174-33 of the Zoning Bylaws to allow for a garage addition, alterations, extensions to a pre- <br /> existing, non-conforming single family dwelling on property located in the R-3 Zoning District, <br /> and Little Neck Bay Zoning District Map 126 Parcel 40, Mashpee, MA. <br /> Sitting on this hearing are the four regular Board members, and Associate Member, Brad Pittsley, <br /> Attorney Christopher Kirrane represented the owners of 25 Tide Run who were in the audience, <br /> and Mr. Mark Dibb, with Cape & Islands Engineering, and the Architect with RESCOM. The <br /> property is located in the Little Neck Bay subdivision. The lot coverage is 30%, the front yard <br /> setback is 30 ft., and the rear yard setback is 20 ft. as opposed to 15 ft. The existing structure is <br /> conforming except for setbacks to wetlands, and lot coverage. The lot is unique because it is only <br /> a little over a third in LSTCSF. The lot contains a total of 15,060 sq. ft. of land which would make <br /> the minimum lot size for the Little Neck Bay area. However, under LSTCSF the lot size is only <br /> 6,325 sq. ft. The existing lot coverage is 35% because some of the lot is under LSTCSF. The lot <br /> area is increasing from 14.6%to 16.6%which is under the maximum allowed percent lot coverage <br /> in the Little Neck Bay Cluster Subdivision. There are no rear, side yard or front yard non- <br /> conformities. The new building on top of the existing foundation will not create any new non- <br /> conformities, and not intensifying any of the existing non-conformities. <br /> Attorney Kirrane stated that the existing structure is being removed, but the existing foundation is <br /> remaining. There will be some expansion of the footprint that will include a two car garage, the <br /> entry way will be closed off and moved forward slightly. There's a significant portion of the deck <br /> that is within LSTCSF. The entire structure including the house and the decking will be removed <br /> from the LSTCSF, so there will be no structure within the flood zone. There will be a patio, and <br /> spa, but everything else will be removed from the LSTCSF. The Board of Health requires a new <br /> I/A system, and his client is agreeable to include that as a condition if approved by the Board. <br /> Chairman Furbush asked if the pool is within the LSTCSF. Attorney Kirrane said; yes, but was <br /> approved by the Conservation Commission. He is concerned with the draining aspect of the pool. <br /> Mr. Morris, Building Commissioner said that he required this project before the Board because of <br /> setbacks from wetlands. <br /> 13 <br />