My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/10/2024 CAPITAL IMPROVEMENT PROGRAM Minutes
>
01/10/2024 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2024 5:00:29 PM
Creation date
1/22/2024 4:18:22 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*APPROVED 1-18-2024* Capital Improvement Program Committee Minutes January 10, 2024 <br /> She further explained that both of these items have been in the CIP plan and would be a continuation of the <br /> plan as approved in previous years. Ms. DeBoer also stated that the proposed FY 25 School Budget has <br /> $50,000 in it to fund the Chromebooks and will be removed from the budget if the CIP request moves <br /> forward. Mr. Collins referred to Assistant Superintendent Hope Hanscom's statements during the FY25 <br /> Budget Hearings that the funding for the Chromebooks is an ongoing operational need. <br /> School Finance Director Ashley Lopes addressed that the ongoing Food Service Equipment upgrade at <br /> $25K/yr is important to maintain the equipment,the FY 2025 monies will be used to replace the failing <br /> freezers at the schools. <br /> • Plannin ,and Construction <br /> Flooring Replacement $ 100,000 <br /> .... ....... .. ........ ... ..... .... ..... ........ . .... ....... ....... ............ ..... ................. ._..... ............ <br /> Security Camera/DVR Replacement $ 25,000 <br /> DPW Masonry Wall Restoration w. _.----._...------. _.,,, $ 80,000 <br /> PD Station Renovation-Design/Engineering $ 2,700,000 <br /> DPW Facility-Design/Engineering $ 1,600,000 <br /> DPW Vehicle Wash Facility _$.... 1,000,000 <br /> MMHS Parking Lot Reconstruction $ 350,000 <br /> . . ......... _ .....- _ __....... __...._ ..,.. <br /> Fire Alarm System Upgrades (MMHSFY25) $ 128,000 <br /> _.... .__ _..._...� _ .......... <br /> Senior Center Roof Restoration (Membrane) <br /> embrane) $ 160,000 <br /> School Safety& Security Window Film (KCC) $ 45,000 <br /> Proposed Community Building-Needs Assessment, Site Selection & Conceptual Design $ 40,000 <br /> 111-111 ........... _....... ............ ............... . ..w...._ .... ........ ......_....... . .........._. _..... _, <br /> Heritage Park Improvements - Phase II $ 70,000 <br /> DNR Boat/Equipment Storage Yard-Design, Engineering, Construction $ 130,000 <br /> _. ... _... .__.a_ <br /> DNR Shellfish Propagation Upgrades $ 70,000 <br /> QS/KCC Bus Access Road-Engineeringg ... $__ 75 0 <br /> & Design 000 <br /> Total Planning &Construction $ 6,573,000 <br /> DPW Director Catherine Laurent <br /> presented <br /> FY 2025 CI..... ........ .. ..... ....... ....... ....... ...... .. .._..._ .... .. <br /> p P request from the..P Planning and Construction <br /> Committee as per the schedule above. <br /> Flooring replacement is a continuation of the CIP plan as in previous years. <br /> Security DVRs and Cameras: The plan is to replace the DVRs every five years to prevent a failure similar to <br /> what happened this year. The cameras will be replaced as needed. <br /> DPW masonry wall is failing at the DPW building and if repaired it will get the building through until the <br /> entire building can be replaced, part of the funding required for this project would require another vote at <br /> Town Meeting to repurpose and reauthorize the borrowing approved at a previous Town Meeting. <br /> The Police Station is in dire need of replacement as per Police Captain Thomas Rose and per the report <br /> given by consultant Weston and Sampson Kaestle Boos Associates report. It is predicted to cost $33 Million <br /> to renovate the station and the estimated cost to construct a new station on the property behind the <br /> current station would be around $36.5 Million. <br /> PD Cell block area is failing doesn't meet current requirements for prisoner safety as per the DPW Director <br /> Mr. McKelvey asked for more information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.